My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-10-03_REVISION - M1977344 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977344
>
2023-10-03_REVISION - M1977344 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2023 8:56:09 AM
Creation date
10/4/2023 10:37:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977344
IBM Index Class Name
Revision
Doc Date
10/3/2023
Doc Name Note
App 4.1 Blasting Plan
Doc Name
Request For Amendment To Permit
From
Holcim (US) Inc.
To
DRMS
Type & Sequence
AM2
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Originating Department: QUARRY Classification: <br />Work Instruction/SOP <br />E Q H&S <br />Y Y Y <br />Date Issued: 8/1/22 Revision Date: 03/8/2023 Control Number: PD. HAC Number: <br />Prepared By: Jeffrey Hauser <br />Title: Quarry Supervisor <br />Approved By: Oscar Mancera <br />Title: Quarry Manager Page 1 <br />Distribution: H:Quarry:Safety:Procedures_SOP <br />Subject: Drill And Blasting SOP <br /> <br /> <br />● Any misfire or hazardous condition must be reported to Quarry Management prior to any work occurring. This <br />includes connecting the misfire and re-initiation attempts <br />● Complete the misfire checklist. <br /> <br />Misfires can be handled in one of three ways: <br /> <br />1. Re-priming or reconnecting surface lines and re-shooting unfired holes <br />This can only be done if: <br />A. Proper burden is present in the front of unfired holes or <br />B. Sufficient material can be placed in front of free face to replace robbed burden <br />C. The blast safety zone can be extended to a size capable of containing any increase in rock throw as a result of <br />robbed burden <br /> <br />2. Removing the primer elements from un-shot holes <br /> This requires the removal of stemming material by: <br />● The use of air pressure only on electronic and nonel detonators (as long as an anti -static line is used) <br />● Mechanically removing overburden and stemming to access the explosive column <br />● Flushing the stemming material with water <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.