Laserfiche WebLink
Mill <br />Task Description:Mobilize /Demobilize Task #007 <br />Site:Red Creek Quarry <br />EQUIPMENT TRANSPORT RIG COST <br />Rig Capacities:0-25 Tons 26-50 tons 51+ tons <br />Unit Cost:88.67$ 117.55$ 125.45$ <br />NON ROADABLE EQUIPMENT <br />Machine Weight/Tons <br />Haul trip <br />cost/hr/fleet <br />Return Trip <br />cost/hr/fleet <br />DOT Permit <br />cost/fleet <br />CAT D8 (2)53.08 411.28$ 125.45$ 250.00$ <br />CAT 12M (3)16.01 226.45$ 88.67$ 250.00$ <br />CAT 950 (2)20.13 368.14$ 88.67$ 250.00$ <br />Drill/Broadcast <br />seeder with tractor 25 128.26$ 88.67$ -$ <br />Subtotal 1,134.13$ 391.46$ 750.00$ <br />ROADABLE EQUIPMENT <br />2500 gallon water truck 68.18$ 68.18$ <br />Fuel tanker 81.14$ 81.14$ <br />Lube truck 94.90$ 94.90$ <br />Flatbed truck 115.89$ 115.89$ <br />Subtotal 360.11$ 360.11$ <br />EQUIMENT HAUL DISTANCE AND TIME <br />Pueblo 20 miles one-way <br />Average speed 40 mph <br />Transportion Cycle Time Hours <br />Non-Roadable Roadable <br />Haul time:1 1 <br />Return time:1 1 <br />Loading time:1 NA <br />Unloading time:1 NA <br />Subtotals:4 2 <br />Total Non-Roadable Cost:2,486.71$ <br />Total Roadable Cost:720.22$ <br />JOB TIME AND COST <br />Total time:8 <br />Total cost:7,913.86$