Laserfiche WebLink
Task Description:Distribute topsoil over affected areas Task #005 <br />Site:Red Creek Quarry <br />HOURLY EQUIPMENT COST <br />Basic Machine:C730 Truck CAT 950 Loader CatD8 Dozer <br />Unit Cost/Hour:129.72$ 95.37$ 191.83$ <br />Unit Production:18.06 LCY <br />403.58 LCY/Hr 528.59 LCY/Hr <br />MATERIAL QUANTITIES <br />Initial volume:520,300 6 inches over 645 acres <br />Swell factor:1.125 <br />Loose volume:585,338 LCY <br />TRAVEL TIME <br />Haul distance 200 ft Distance from topsoil stockpiles in perimeter berm <br />Total cycle time 5.37 minutes <br />JOB TIME AND COST <br />Fleet size:2 truck, 1 loader, 1 dozer <br />Total job time:553.68 <br />Fleet cost /hour 901.45 <br />Total job cost:499,113.20$