Laserfiche WebLink
Task Description:Backfill 2 bench highwalls 3H:1V Task #001 <br />Site:Red Creek quarry <br />HOURLY EQUIPMENT COST <br />Basic Machine:C730 Truck CAT 950 Loader CatD8 Dozer 2500 gallon water truck <br />Unit Cost/Hour:129.72$ 95.37$ 191.83$ 57.56$ <br />Unit Production:18.06 LCY <br />90.30 LCY/Hr 528.59 LCY/Hr <br />MATERIAL QUANTITIES <br />Initial volume:8,435,912 LCY <br />Swell factor:1.125 <br />Loose volume:9,490,401 LCY <br />TRAVEL TIME <br />Haul distance 1000 ft <br />Total cycle time 12 minutes <br />JOB TIME AND COST <br />Fleet size:4 truck, 2 loader, 2 dozer, 1 water truck <br />Total job time:8,977.09 <br />Fleet cost /hour 1,150.84 <br />Total job cost:10,331,195.34$