Laserfiche WebLink
0010 <br /> General Shale <br /> Building The American Dream® <br /> RECEIVED <br /> September 19, 2023 <br /> OCT 0 3 2023 <br /> Colorado Division of Reclamation, Mining, and Safety Colorado Division of Reclamation, <br /> Mr. Joel Renfro Mining and Safety <br /> Environmental Protection Specialist <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 <br /> Re: M-1993-004 Navajo Mine, Elbert County, Colorado <br /> Technical Revision <br /> Dear Mr. Renfro: <br /> General Shale Brick, Inc. (GSB) is in receipt of the inspection report for the Navajo Mine dated May 3, <br /> 2023. The inspection report cites 3 problems: <br /> Problem 1 General Compliance With Mine Plan <br /> The current mining plan needs to be updated and clarified pursuant to C.R.S. 34-32.5-112(1)(c)(VI) <br /> and Rule 6.4.4. The operator must provide sufficient information to describe or identify how the operator <br /> intends to conduct the operation. Specifically, the mining plan reeds to be updated to describe the <br /> stormwater management plan for the site, including all water diversions and impoundments. This <br /> revision must also include an updated mining plan map that meets the requirements of Rules 6.2.1(2) <br /> and 6.4.3. All stormwater management structures must be shown on the updated map. <br /> Exhibit D Mining Plan Changes <br /> (a) :lining :'athods <br /> TR-1 changed the mining direction. Add water trucks, motor graders, excavators, and trucks to <br /> the list of mining equipment. <br /> (b) Eaii 111V ii11y <br /> Add water trucks, motor graders, excavators, and trucks to the list of mining equipment. <br /> (c) Water Diversions and Impoundments <br /> The pit intersected groundwater and more inFon—nation is found in Exhibit G 11-'✓ater Information. <br /> Per paragraph a of the groundwater permit General Shale is required prevent surface water from <br /> entering the pit using berms or other barriers. General Shale has installed a perimeter berm and <br /> ditch around the crest of the highvvall to prevent surface water from entering the pit and to divert <br /> stormwater flows around the pit. Where grades are steep enough to cause erosion and head <br /> cuts, check dams will be installed to minimize erosion. This configuration will follow the life of <br /> the mane as manar,g progresses east. <br /> The clay stockpile pad area has been graded to flow to the south and west with berms along the <br /> perimeter of the clay stockpile pad area to direct stormwater flows. A stormwater erosion <br /> livestock pond was bui►t to capture stormwater flows fro►►► the clay stockpile pau area. in 2023 <br /> the Division of Water Resources approved clay stockpile pad area stormwater pond as a <br /> livestock and erosion pond. <br /> (d)a is size of ar ea(s) to u -worked at any one time. <br /> No Change <br /> (e) An approximate timetable to describe the mining operation. <br />