Laserfiche WebLink
RECEIVED <br /> In response to the letter dated 05/11/2023 SEP 2 7 2023 <br /> Exhibit C:4,5: See new survey maps Colorado Division of Reclamation,Mining and Safety <br /> Exhibit D: 6. Over burden will not need to be removed to access the material to be mined. The depth <br /> and thickness of the material goes down much deeper then will be mined. <br /> 7. Material does not change. <br /> 8. The material to be mined is road base and sized gravel. No incidental products are expected to be <br /> mined. <br /> 9. Growth median will be in stock piled in various areas as needed. <br /> 10. See survey <br /> 11. 3 to 1 slope <br /> 12. We will be doing it in phases <br /> 13.Our intent is to reclaim it as we go and as we leave an area already mined area. We have been <br /> moving the oversized boulders back up against the back walls already as they will be used as the <br /> reclamation process progresses. <br /> 14. We will be doing the horse area in the flat area. We will be sloping and putting the mined area on <br /> the hillside back to pre-mining. So it will be a hillside with grasses growing like the native area. So it will <br /> be classified as rangeland and ag. <br /> 15. see survey <br /> 16. Broadcast <br /> 17. See attachment <br /> 18. non appliable <br /> Exhibit N. <br /> 21. In original paper work 07/23' <br /> Exhibit S: <br /> 23: The fences are owned by us. <br />