My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-06-29_PERMIT FILE - C1981019A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2023-06-29_PERMIT FILE - C1981019A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2024 9:41:43 AM
Creation date
9/27/2023 8:50:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
6/29/2023
Doc Name
Volume 1 Rule 4
Section_Exhibit Name
4.01 Through 4.30
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 3 PERFORMANCE BOND REQUIREMENTS <br /> <br />Rule 4 Performance Standards 4-40 Revision Date: 6/13/23 <br /> Revision No.: MR-247 <br />for livestock and wildlife, but are no longer a component of the desired post-mining vegetation <br />communities. <br /> <br />For post-2008 revegetation, the seed mixes (please see Tables 2.05.4-7 through 2.05.4-9) are <br />comprised entirely of native species, except with the inclusion of modest quantities of small burnett <br />or nitrogen fixing legumes such as cicer milkvetch or alfalfa as supplemental forage for wildlife. <br /> <br />4.15.3 Seeding and Planting <br /> <br />Please refer to the reclamation plan found in Section 2.05.4 <br /> <br />4.15.4 Mulching and Other Soil Stabilizing Practices <br /> <br />As addressed in Section 2.05.4, Colowyo currently does not mulch, chisel plow, or terrace, because <br />experience demonstrates sufficient surface roughness survives the topsoil laydown process to <br />maintain favorable seed-bed conditions. If conditions warrant additional topsoil manipulation, <br />Colowyo will utilize an appropriate practice specific to the circumstance. Best management <br />practices, such as minimizing topsoil handling and manipulation, ripping along the contour, <br />disking, or cross ripping will be implemented and are further discussed in Section 2.05.4. <br /> <br />4.15.5 Grazing <br /> <br />All the lands reclaimed by Colowyo will not be grazed by livestock for a period of at least three <br />years after seeding or planting and will be managed to promote the postmining land use. <br /> <br />Grazing by livestock will not commence until Colowyo has demonstrated to the satisfaction of the <br />Division that the vegetation on the reclaimed surface is adequately established and can be expected <br />to withstand grazing pressures. Any grazing studies undertaken by Colowyo will not preclude or <br />interfere with postmining vegetation sampling as required in section 4.15.8. <br /> <br />4.15.6 Field Trials <br /> <br />As a result of previous consultations with CPW and DRMS, Colowyo implemented three field <br />trials. The field trials were meant to provide information to the appropriate expectations for <br />success/failure of establishing these habitat types at Colowyo in the context of a ten-year bond <br />clock, to provide some baseline information that can be used to modify practices, and the plant <br />materials used to meet the current expectations. <br /> <br />The study was comprised of three test scenarios designed to explore different species and habitat <br />requisites necessary for tall shrub survival. The first treatment was to establish an overstory of <br />quaking aspen (Populus tremuloides) trees that are planted into deep topsoil (48 inches). The <br />second treatment was serviceberry (Amelanchier alnifolia) and chokecherry (Prunus virginiana) <br />shrubs planted into deep topsoil (48 inches). The third and final treatment was serviceberry and <br />mountain mahogany (Cercocarpus montanus) shrubs planted into shallow topsoil (4 inches). The <br />aspen trees and/or tall shrubs were planted in ten-220-foot long rows per treatment, for a total of <br />550 plants per treatment. The initial planting consisted of 550 quaking aspen tubelings in the first
The URL can be used to link to this page
Your browser does not support the video tag.