My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-06-29_PERMIT FILE - C1981019A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2023-06-29_PERMIT FILE - C1981019A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2024 9:41:43 AM
Creation date
9/27/2023 8:50:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
6/29/2023
Doc Name
Volume 1 Rule 4
Section_Exhibit Name
4.01 Through 4.30
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 3 PERFORMANCE BOND REQUIREMENTS <br /> <br />Rule 4 Performance Standards 4-34 Revision Date: 6/13/23 <br /> Revision No.: MR-247 <br />Colowyo; therefore, it is not permitted for Colowyo nor required to be bonded for in accordance <br />with Rule 3.02.1(2). <br /> <br />In 2021, approximately 641 acres within Colowyo’s permit boundary, directly adajencet to the east <br />side of the Collom Pit, was affected by a wild land fire. The location of the wild land fire is shown <br />on Figure 4.12-8. The area that was burned is mostly comprised of sagebrush. Additional surface <br />disturbance within the permit boundary of approximately five acres was created to cut in a fire <br />lines to control and fight the fire. The relatively low intensity nature of the fire does not appear to <br />warrant or require supplemental seeding; however, the areas impacted by the fire lines will be <br />roughened, seeded with the approved reclamation seed mix, and reported in the annual reclamation <br />report. <br /> <br />On September 28, 2022, approximately 11 acres within Colowyo’s permit boundary, directly <br />adjacent to the Gossard Loadout was affected by a wild land fire. The location of the wild land <br />fire is shown on Figure 4.12-7. The area that was burned is mostly comprised of sagebrush. The <br />local Bureau of Land Management field office deterimed the fire was due to a bird striking a power <br />line and the fire was not related to Colowyo’s mining operations. <br /> <br />4.13 CONTEMPORANEOUS RECLAMATION <br /> <br />All reclamation actives, including but not limited to backfilling, grading, topsoil, replacement and <br />revegetation, will be carried out as contemporaneously as practicable with mining operations. <br />Implementation of the reclamation plan, as described in Section 2.05.4, will assure that each step <br />in the reclamation process is completed in a timely manner. <br /> <br />Because of the multi-seam nature of the mining operation described in Section 2.05, backfilling <br />and grading cannot be completed within 180 days following the coal removal. Backfilling and <br />grading will be completed in variance of the 180 day requirement in a manner previously approved <br />and described below, and in Sections 2.05 and 4.14.1. A series of benches will be necessary in the <br />operation to recover the lower coal seams, and an additional series of benches will be necessary to <br />dump the shovel/truck overburden material in a configuration that achieves the topography shown <br />on the post-mining Topography Map (Map 19). When multi-seams are mined, backfilling and <br />rough grading cannot begin until the lower-most seam is mined. See Spoil Grading Map (Map <br />29), which shows the time frames in which grading will occur. <br /> <br />Topsoil will be removed prior to the mining disturbance according to the timetable established on <br />the Topsoil Handling – South Map (Map 28). As can be observed from this map, the initial topsoil <br />removed at the operation must be stockpiled; however, as the operation progresses, topsoil can be <br />immediately redistributed rather than stockpiled. <br /> <br />Revegetation will commence as soon as the topsoil has been redistributed and prepared for seeding <br />as described in Section 2.05.4. The area will be seeded with the seed mixture described in Section <br />2.05.4 as quickly as possible. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.