My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-05-09_PERMIT FILE - C1981019A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2023-05-09_PERMIT FILE - C1981019A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2024 9:47:30 AM
Creation date
9/19/2023 10:22:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
5/9/2023
Doc Name
Table of Contents
Section_Exhibit Name
Volume 15 Table of Contents
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> <br /> ii Revision Date: 4/28/22 <br /> Revision No.: TR-154 <br />2.05.3 (5) Topsoil ........................................................................................................................................ 74 <br />2.05.3 (6) Overburden ................................................................................................................................. 75 <br />2.05.3 (7) Coal Handling Structures ........................................................................................................... 78 <br />2.05.3 (8) Coal Mine Waste and Non-Coal Processing Waste ................................................................... 78 <br />2.05.3 (9) Return of Coal Mine Waste to Abandoned Workings ................................................................ 79 <br />2.05.4 (1) Reclamation Plan ........................................................................................................................ 79 <br />2.05.4 (2)(a) Reclamation Timetable .......................................................................................................... 79 <br />2.05.4 (2)(b) Reclamation Costs ................................................................................................................. 79 <br />2.05.4 (2)(c) Backfilling Plan ..................................................................................................................... 79 <br />2.05.4 (2)(d) Topsoil Salvage ..................................................................................................................... 79 <br />2.05.4 (2)(e) Reclamation Revegetation ..................................................................................................... 80 <br />2.05.4 (2)(f-h) Disposal, Mine Openings, Water and Air Control .............................................................. 80 <br />2.05.5 Post-Mining Land Uses .................................................................................................................... 81 <br />2.05.6 Mitigation of Impacts of Mining Operations ....................................................................... 82 <br />2.05.6 (1) Air Pollution Contol Plan ........................................................................................................... 82 <br />2.05.6 (2) Fish and Wildlife Plan ................................................................................................................ 82 <br />2.05.6 (3)(a) Protection of the Hydrologic Balance .................................................................................... 85 <br />2.05.6 (3)(b)(i & ii) Hydrologic Controls ................................................................................................... 86 <br />2.05.6 (4) Protection of Public Parks and Historic Places ........................................................................ 102 <br />2.05.6 (5-6) Surface Mining near Underground Mining; Subsidence Control ......................................... 102 <br />2.06 PERMIT REQUIREMENTS - SPECIAL MINING CATEGORIES ................................ 102 <br />2.06.1-3 Scope, Experimental Mining, and Mountain Top Removal ....................................................... 102 <br />2.06.4 Steep Slope Mining ............................................................................................................ 102 <br />2.06.5 Variance from Approximate Original Contour Restoration Requirements ........................ 102 <br />2.06.6 Prime Farmlands ................................................................................................................ 102 <br />2.06.7 Reclamation Variance ........................................................................................................ 102 <br />2.06.8 Alluvial Valley Floor (AVF) .............................................................................................. 103 <br />2.06.9 – 2.06.11 Augering, Processing Plants, In-Situ Processing ..................................................... 107 <br />2.06.12.1 Coal Refuse Piles ............................................................................................................... 107 <br />2.07 – 2.10 VARIOUS .......................................................................................................................... 108 <br />RULE 3 – PERFORMANCE BOND ........................................................................................................... 1 <br />RULE 4 – PERFORMANCE STANDARDS ............................................................................................... 1 <br />4.02 SIGNS AND MARKERS ..................................................................................................... 1 <br />4.02.1 Specifications ......................................................................................................................... 1 <br />4.02.2 Mine and Permit Identification Signs .................................................................................... 1 <br />4.02.3 Perimeter Markers .................................................................................................................. 1 <br />4.02.4 Duration of Maintenance ........................................................................................................ 1 <br />4.02.5 Stream Buffer Zone Markers ................................................................................................. 1 <br />4.02.6 Blasting Signs ........................................................................................................................ 1 <br />4.02.7 Topsoil Markers ..................................................................................................................... 1 <br />4.03 ROADWAYS ........................................................................................................................ 1 <br />4.03.1 Haul Roads ............................................................................................................................. 1 <br />4.03.2 Access Roads ......................................................................................................................... 3 <br />4.03.3 Light-Use Roads .................................................................................................................... 3 <br />4.04 SUPPORT FACILITIES ....................................................................................................... 4 <br />4.05 HYDROLOGIC BALANCE ................................................................................................ 4 <br />4.05.1 General Requirements ............................................................................................................ 4 <br />4.05.2 Water Quality Standards and Effluent Limitations ................................................................ 4 <br />4.05.3 Diversions and Conveyance of a Watershed Less than One Square Mile ............................. 4 <br />4.05.4 Stream Channel Diversions (Relocation of Streams) ............................................................. 5 <br />4.05.5 Sediment Control Measures ................................................................................................... 5
The URL can be used to link to this page
Your browser does not support the video tag.