Laserfiche WebLink
TABLE OF CONTENTS <br /> <br /> ii Revision Date: 4/28/22 <br /> Revision No.: TR-154 <br />2.05.3 (5) Topsoil ........................................................................................................................................ 74  <br />2.05.3 (6) Overburden ................................................................................................................................. 75  <br />2.05.3 (7) Coal Handling Structures ........................................................................................................... 78  <br />2.05.3 (8) Coal Mine Waste and Non-Coal Processing Waste ................................................................... 78  <br />2.05.3 (9) Return of Coal Mine Waste to Abandoned Workings ................................................................ 79  <br />2.05.4 (1) Reclamation Plan ........................................................................................................................ 79  <br />2.05.4 (2)(a) Reclamation Timetable .......................................................................................................... 79  <br />2.05.4 (2)(b) Reclamation Costs ................................................................................................................. 79  <br />2.05.4 (2)(c) Backfilling Plan ..................................................................................................................... 79  <br />2.05.4 (2)(d) Topsoil Salvage ..................................................................................................................... 79  <br />2.05.4 (2)(e) Reclamation Revegetation ..................................................................................................... 80  <br />2.05.4 (2)(f-h) Disposal, Mine Openings, Water and Air Control .............................................................. 80  <br />2.05.5 Post-Mining Land Uses .................................................................................................................... 81  <br />2.05.6 Mitigation of Impacts of Mining Operations ....................................................................... 82  <br />2.05.6 (1) Air Pollution Contol Plan ........................................................................................................... 82  <br />2.05.6 (2) Fish and Wildlife Plan ................................................................................................................ 82  <br />2.05.6 (3)(a) Protection of the Hydrologic Balance .................................................................................... 85  <br />2.05.6 (3)(b)(i & ii) Hydrologic Controls ................................................................................................... 86  <br />2.05.6 (4) Protection of Public Parks and Historic Places ........................................................................ 102  <br />2.05.6 (5-6) Surface Mining near Underground Mining; Subsidence Control ......................................... 102  <br />2.06 PERMIT REQUIREMENTS - SPECIAL MINING CATEGORIES ................................ 102  <br />2.06.1-3 Scope, Experimental Mining, and Mountain Top Removal ....................................................... 102  <br />2.06.4 Steep Slope Mining ............................................................................................................ 102  <br />2.06.5 Variance from Approximate Original Contour Restoration Requirements ........................ 102  <br />2.06.6 Prime Farmlands ................................................................................................................ 102  <br />2.06.7 Reclamation Variance ........................................................................................................ 102  <br />2.06.8 Alluvial Valley Floor (AVF) .............................................................................................. 103  <br />2.06.9 – 2.06.11  Augering, Processing Plants, In-Situ Processing ..................................................... 107  <br />2.06.12.1 Coal Refuse Piles ............................................................................................................... 107  <br />2.07 – 2.10 VARIOUS .......................................................................................................................... 108  <br />RULE 3 – PERFORMANCE BOND ........................................................................................................... 1  <br />RULE 4 – PERFORMANCE STANDARDS ............................................................................................... 1  <br />4.02  SIGNS AND MARKERS ..................................................................................................... 1  <br />4.02.1 Specifications ......................................................................................................................... 1  <br />4.02.2 Mine and Permit Identification Signs .................................................................................... 1  <br />4.02.3 Perimeter Markers .................................................................................................................. 1  <br />4.02.4 Duration of Maintenance ........................................................................................................ 1  <br />4.02.5 Stream Buffer Zone Markers ................................................................................................. 1  <br />4.02.6 Blasting Signs ........................................................................................................................ 1  <br />4.02.7 Topsoil Markers ..................................................................................................................... 1  <br />4.03  ROADWAYS ........................................................................................................................ 1  <br />4.03.1 Haul Roads ............................................................................................................................. 1  <br />4.03.2 Access Roads ......................................................................................................................... 3  <br />4.03.3 Light-Use Roads .................................................................................................................... 3  <br />4.04  SUPPORT FACILITIES ....................................................................................................... 4  <br />4.05  HYDROLOGIC BALANCE ................................................................................................ 4  <br />4.05.1 General Requirements ............................................................................................................ 4  <br />4.05.2 Water Quality Standards and Effluent Limitations ................................................................ 4  <br />4.05.3 Diversions and Conveyance of a Watershed Less than One Square Mile ............................. 4  <br />4.05.4 Stream Channel Diversions (Relocation of Streams) ............................................................. 5  <br />4.05.5 Sediment Control Measures ................................................................................................... 5