Laserfiche WebLink
Site Altitude: <br />Altitude Adj: <br />Job Efficiency: <br />Net Correction: <br />7,500 <br />1.00 <br />0.83 <br />0.83 <br />feet <br />(CAT HB) <br />(1 shift/day) <br />multiplier <br />AdjustedHourly Unit Production: 0.74 Acres/hr <br />Adjusted Hourly Fleet Production: 1.49 Acres/hr <br />JOB TIME AND COST <br />Fleet size: 2 Grader(s) <br />Unit cost: $713.149 Per acre <br />Totaljob time <br />12.70 <br />Totaljob cost: $13,478 <br />Page 8 of 115 <br />Hours <br />CIRCES Cost Estimatmg Sogwace <br />