Laserfiche WebLink
A <br /> A <br /> � I <br /> 115 / <br /> n <br /> / WALLS EXTEND ABOVE GRADE ON <br /> a <br /> \ ALL FOUR SIDES V 115 <br /> / A / BYPASS DRAIN PIPE PASSES THROUGH <br /> S <br /> WALL SEE WHEELER DRAWINGS / <br /> REMOVE AND DISPOSE OF EXISTING CONCRETE / <br /> COVER SLAB& FRONT VERTICAL WALL, REMOVE <br /> RIP RAP &SOIL TO EXPOSE CULVERT AT FULL / FOUNDATION SLAB ON GRADE IS TO BE: <br /> CIRCLE CROSS SECTION CUT CULVERT AND 12"THICK, REINFORCED w/#6 AT 12"O.C. EACH WAY <br /> CLEAN EDGES OF ALL RUST, DIRT& DEBRIS AT BOTTOM OF SLAB,w/STD. HOOKS AT EDGES OF � <br /> SLAB, MIN. 3"CLEAR TO SOIL \ <br /> \ / PLACED ON COMPACTED SOIL RE: SUBGRADE PREP <br /> / AND GEOTECH REVIEW OF OPEN EXCAVATION <br /> FILL VOLUME ABOVE SLAB UP TO EXIST. BOTTOM OF <br /> / CULVERT INLET ELEVATION w/CONCRETE, <br /> / REINFORCED w/#4 AT 6"O.C. E.W.AT TOP w/STD. � <br /> \ \ / HOOKS EACH END <br /> Q� 114 115 <br /> 1\ <br /> �' <br /> 09 <br /> i \ ' <br /> 3 <br /> 114 115 <br /> CLEAN WATER BYPASS PIPE BEARS ON <br /> \ � � SHEAR KEY WALL EXTENDS BELOW TOP OF NEW WALL,w/CLAMP/ANCHOR TO <br /> GRADE, PARTIALLY ALIGNED WITH \ WALL, COORD. PRODUCT DURING <br /> FRONT WALL SUBMITTAL PROCESS <br /> 1 EXISTING CULVERT PLAN 2 RETAINING BOX PLAN <br /> 115 114 1/4" = 1 1-011 115 114 1/4" = 1 1-011 <br /> BAUR& ASSOCIATES J. C. BAUR AND ASSOCIATES, INC. PRODUCED THE INFORMATION PRESENTED ON <br /> CONSULTING ENGINEERS THESE DRAWINGS THROUGH THE USE OF TECHNICAL INFORMATION AND <br /> PRACTICAL EXPERIENCE SPECIFIC TO ITS EFFORTS. RECEIVING THESE DRAWINGS <br /> 5485 Conestoga Ct. Suite 200, DOES NOT GUARANTEE ANY RIGHTS TO SUCH TECHNICAL INFORMATION AND <br /> Boulder,CO 80301 PRACTICAL EXPERIENCE. ANY ALTERATION OR ADAPTATION OF THE DATA OR <br /> 303-444-9121(v),303-415-1070(1) CONTENTS OF THESE DRAWINGS SHALL BE AT USER'S SOLE RISK AND WITHOUT <br /> jcbaur.com Project No. 23018 ANY LIABILITY OR LEGAL RESPONSIBILITY TO J. C. BAUR AND ASSOCIATES, INC. <br /> NO. DATE MADE BY CKD.BY REMARKS This drawlnCg.' together with any and all additions DRAWING NO. REFERENCE CLIMAX MOLYBDENUM CLIMAX MINE <br /> 0Climax5 DAM SEEPWATER COLLECTION AREA p 06/27/23 DAN JLK ISSUED FOR BID corrections, ChanC/eS and alterat1017S thereof lS � <br /> U) the property of Climax Molybdenum Company and o Molybdenum CLIMAX, CO <br /> Z Al 08/03/23 DAN JLK CONSTRUCTION MADE BY PROJECT NUMBER <br /> p /s furnished On the express Condition that it shall Lu A Freeport-McMoRan Company SECONDARY CONTAINMENT SYSTEM 05/30/23 <br /> 2 U DAN 1051.191.17 <br /> U) not be reproduced, copied, tent, or disposed of Z <br /> �J,J CHECKED BY <br /> zef dlreCti Or lndlreCti , nor Used for an Other 3700 S. INCA STREET DRAWING NO. <br /> w y y y � PLANS AT CULVERT JLK 08/03/23 <br /> ry 0 purpose than for which it is specifically furnished LI W. W. W H E E L E R ENGLEw000, Co e0 1 1 0-3405 <br /> LL & ASSOCIATES, INC 303-761 -41 30 ACCEPTED BY 6-807-00114 <br /> zef without the prior written consent of said Climax CULVERT INLET CUTOFF <br /> 0 Molybdenum Company Water Resources Engineers FAX 303-761 -2802 <br /> PROJ. TRUE PROJ. TRUE <br /> a� anN a� anN <br /> N N N N <br />