Laserfiche WebLink
MATERIAL LIST MATERIAL LIST <br /> ITEM UNIT QTY DESCRIPTION PURCHASER NOTES/ LOCATION ITEM UNIT QTY DESCRIPTION PURCHASER NOTES/ LOCATION <br /> HDPE PIPE AND FITTINGS 400 EA 1 SUBMERSIBLE PUMP,TSURUMI MODEL 50SFQ2.75,1 HP,316SS,75 GPM AT 21-FT TDH. OWNER PUMP STATION <br /> 8"IPS DR 21 HOPE PIPE,PE4710,50'LENGTHS,IN ACCORDANCE WITH SPECIFICATION 02530: STATION 0+00 TO 6+32. APPROX.10 401 EA 1 SUBMERSIBLE PUMP,TSURUMI MODEL 80SFQ23.7,5 HP,316SS,250 GPM AT 31-FTTDH. OWNER PUMP STATION <br /> 100 LF 650 HOPE PIPE. OWNER EXTRA <br /> 402 EA 1 7.5 KW ELECTRIC UNIT HEATER OWNER PUMP STATION <br /> 101 EA 1 8"X 6"IPS DR 21 HOPE MOLDED REDUCER,PE4710,IN ACCORDANCE WITH SPECIFICATION OWNER STATION 0+05 <br /> 02530:HOPE PIPE. 403 EA 1 JIB CRANE BY GTON WITH 10 FT REACH,360-DEGREE SWIVEL,CHAIN OPERATED CONTRACTOR PUMP STATION <br /> 6"IPS DR 21 HOPE FLANGE ADAPTER,PE 4710,IN ACCORDANCE WITH SPECIFICATION 02530: HOIST,1000 LB.B.CAPACITY,STANDARD FINISH. <br /> 102 EA 1 HOPE PIPE. OWNER STATION 0+05 ICE-AWAY BY AIR-O-LATOR CORP.,MODEL#IA-5,1/2 HP,115-V,100'CORD. WITH PE FLOAT <br /> 404 EA 1 AND PROPELLER GUARD. OWNER PUMP STATION <br /> 103 EA 1 6"IPS BACKING RING,EPDXY COATED DUCTILE IRON,PRESSURE RATED MIN.100 PSI,IPP OWNER STATION 0+05 <br /> DELTAFLEX BUP-SDR21,IN ACCORDANCE WITH SPECIFICATION 02530:HOPE PIPE. 405 EA 1 FLOW METER FOR 6"DIA.316SS PIPE. ENDRESS&HAUSER PROSONIC 91W W/LOCAL OWNER PUMP STATION <br /> 8"IPS DR 21 HOPE 90 DEG.MOLDED ELBOW,PE4710,IN ACCORDANCE WITH SPECIFICATION DISPLAY.VE 4-20 MA. <br /> 104 EA 1 02530:HOPE PIPE. OWNER STATION 6+32 SUMP LEL INDICATOR-VEGA VEGAPULS 31,ON-SITE DISPLAY,4-20 MA,MIN.20 FEET <br /> 406 EA 1 RANGE. OWNER PUMP STATION <br /> 105 EA 2 8"IPS DR 21 HOPE 45 DEG.MOLDED ELBOW,PE4710,IN ACCORDANCE WITH SPECIFICATION OWNER STATION 6+32 <br /> 02530:HOPE PIPE. 407 EA 1 HEADER PRESSURE INDICATOR-VEGA VEGABAR 28 PRESSURE SENSOR WITH VEGADIS OWNER PUMP STATION <br /> 8"IPS DR 21 HOPE MOLDED TEE,PE4710,IN ACCORDANCE WITH SPECIFICATION 02530: EXTERNAL DISPLAY,4-20 MA <br /> 106 EA 1 HOPE PIPE. OWNER STATION 6+32 <br /> STRUCTURAL <br /> 107 EA 1 8"IPS DR 21 HOPE FLANGE ADAPTER,PE 4710,IN ACCORDANCE WITH SPECIFICATION 02530: OWNER STATION 6+32 PUMP STATION BUILDING,12'W X 15'L X 8'H,ALL METAL CONSTRUCTION,PER <br /> HOPE PIPE. 500 EA 1 SPECIFICATIONS 13300 AND DRAWING 6-807-00109. OWNER PUMP STATION <br /> 108 EA 1 8"IPS BACKING RING,EPDXY COATED DUCTILE IRON,PRESSURE RATED MIN.100 PSI,IPP OWNER STATION 6+32 72"ID PRECAST CONCRETE MANHOLE:BASE RISER W/INTEGRAL BASE SLAB(5'TALL),2 EA. <br /> DELTAFLEX BUP-SDR21,IN ACCORDANCE WITH SPECIFICATION 02530:HOPE PIPE. RISER SECTIONS(6'TALL),RISER SECTION(2'-10"TALL)WITH SQUARE TOP,ALL WITH STD. <br /> 109 501 EA 1 MANHOLE LADDER RUNGS(SIZE AND SPACE PER MANUFACTURERS RECOMMENDATIONS), OWNER PUMP STATION WET WELL <br /> 110 T&G JOINT,PIPE CUTOUT SIZE AND LOCATION PER DWG.6-807-00109. <br /> 111 502 Lot 1 PUMP STATION BASE SLAB REINFORCED CONCRETE,IN ACCORDANCE WITH SPECIFICATION CONTRACTOR PUMP STATION <br /> 03300:CAST-IN-PLACE CONCRETE <br /> 112 1 LF 1 40 18"DUAL-WALL CORRUGATED HOPE PIPE,GASKETED WATERTIGHT JOINTS CONTRACTOR PUMP STATION INTAKE LINE CULVERT INLET CUTOFF WALL REINFORCED CONCRETE,IN ACCORDANCE WITH <br /> STEEL/PVC/RUBBER PIPE AND FITTINGS 503 Lot 1 SPECIFICATION 03300:CAST-IN-PLACE CONCRETE CONTRACTOR CULVERT INLET CUTOFF WALL <br /> 200 EA 1 8"PVC BLIND FLANGE,MIN.25 PSI,150#DRILLING CONTRACTOR STATION 6+32 504 EA 4 STEEL PIPE SUPPORT FOR 6"CS PIPE W/STANCHION BASE PLATE.ANVIL 63T OR APPROVED CONTRACTOR PUMP STATION PIPE SUPPORTS <br /> EQUIVALENT.PLAIN FINISH <br /> 201 LF 16 6"DIA.SCH 10 316SS PIPE,ASTM A312 CONTRACTOR PUMP STATION AREA STEEL PIPE SUPPORT FOR 3"CS PIPE W/STANCHION BASE PLATE.ANVIL 63T OR APPROVED <br /> 202 LF 16 3"DIA.SCH 10 316SS PIPE,ASTM A312 CONTRACTOR PIPELINE DRAIN 505 EA 1 EQUIVALENT.PLAIN FINISH CONTRACTOR PUMP STATION PIPE SUPPORTS <br /> 203 EA 1 6"SCH 10 316SS HEADER SPOOL A,ASTM A312.REF.DWG.6-807-00109. SUBMIT SHOP DWG. CONTRACTOR PUMP STATION STEEL PIPE SUPPORT FOR 2"CS PIPE W/STANCHION BASE PLATE.ANVIL 63T OR APPROVED <br /> FOR APPROVAL. 506 EA 1 EQUIVALENT.PLAIN FINISH CONTRACTOR PUMP STATION PIPE SUPPORTS <br /> 204 EA 1 6"SCH 10 316SS HEADER SPOOL B,ASTM A312.REF.DWG.6-807-00109. SUBMIT SHOP DWG. CONTRACTOR PUMP STATION 507 Lot 1 WET WELL GRATING,IN ACCORDANCE WITH DRAWING 6-807-00110. CONTRACTOR PUMP STATION <br /> FOR APPROVAL. <br /> 205 EA 2 6"DIA.SCH 10 316SS TEE,WELD FITTING,ASTM A182 CONTRACTOR PUMP STATION 508 EA 1 GRATING SUPPORT BEAM ASSEMBLY,IN ACCORDANCE WITH DRAWING 6-807-00110. CONTRACTOR PUMP STATION <br /> 206 EA 2 6"DIA.SCH 10 316SS 90-DEG.ELBOW,WELD FITTING,ASTM A182 CONTRACTOR PUMP STATION 509 EA 1 U CLAMP FOR BOLTING 8.625"OD HOPE PIPE TO CONCRETE WALL,316 SS CONTRACTOR PIPELINE DISCHARGE <br /> 207 EA 1 3"DIA.SCH 10 316SS 90-DEG.ELBOW,WELD FITTING,ASTM A182 CONTRACTOR PUMP STATION MISCELLANEOUS <br /> 208 EA 2 6"150 LB.BLIND FLANGE,316 STAINLESS STEEL,RAISED FACE,ANSI B16.5 CONTRACTOR PUMP STATION 600 LF 650 PIPE TRACER WIRE,PER DRAWINGS AND SPECIFICATION 02530:HOPE PIPE CONTRACTOR 8"PIPELINE <br /> 209 EA 2 6"150 LB.SLIP-ON FLANGE,316 STAINLESS STEEL,RAISED FACE,ANSI B16.5 CONTRACTOR PUMP STATION 601 LF 650 PIPE WARNING TAPE,PER DRAWINGS AND SPECIFICATION 02530:HOPE PIPE CONTRACTOR 8"PIPELINE <br /> E <br /> 210 EA 1 6"150 LB.WELDNECK FLANGE,316 STAINLESS STEEL,RAISED FACE,ANSI B16.5 CONTRACTOR PUMP STATION 602 CY 75 GRANULAR PIPE BEDDING,IN ACCORDANCE WITH SPECIFICATION 02330:EARTHWORK CONTRACTOR 8"PIPELINE BEDDING <br /> 211 EA 2 3"150 LB.SLIP-ON FLANGE,316 STAINLESS STEEL,RAISED FACE,ANSI B16.5 CONTRACTOR PIPELINE DRAIN 603 CY 150 GRANULAR PIPE BEDDING,IN ACCORDANCE WITH SPECIFICATION 02330:EARTHWORK CONTRACTOR 24"CULVERT BEDDING <br /> 212 EA 1 6"X 6"X 3"SCH 10 316SS REDUCING TEE,WELD FITTING,ASTM A182 CONTRACTOR PIPELINE DRAIN 604 CY 50 STRUCTURAL SUBGRADE GRAVEL,IN ACCORDANCE WITH SPECIFICATION 02330:EARTHWORK CONTRACTOR PUMP STATION,CUTOFF WALL <br /> 213 EA 1 12"DIA.SCH 10 316SS PIPE SPOOL,ASTM A312,1'6"LONG,150 LB.FLANGE ON ONE END. CONTRACTOR CULVERT CUTOFF WALL DRAIN 605 Lot 1 PIPE INSULATION. REF.DWG.108. CONTRACTOR PIPELINE DISCHARGE <br /> LL <br /> 214 EA 1 12"150 LB.BLIND FLANGE,316 STAINLESS STEEL,RAISED FACE,ANSI B16.5 CONTRACTOR CULVERT CUTOFF WALL DRAIN 606 EA 1 VALVE CURB BOX. CONTRACTOR TO DETERMINE MODEL,PART NUMBER,AND LENGTH CONTRACTOR PIPELINE DRAIN <br /> 2"DIA.PUMP DISCHARGE HOSE. QUICK CONNECT ENDS.50 PSI MIN.RATING. VERIFY <br /> 215 LF 20 OWNER PUMP STATION <br /> LENGTH. <br /> E 216 LF 20 3"DIA.PUMP DISCHARGE HOSE. QUICK CONNECT ENDS.50 PSI MIN.RATING. VERIFY OWNER PUMP STATION <br /> LENGTH. NOTES: <br /> 217 EA 1 2"NPTX QUICK CONNECT TRANSITION FITTING. CONTRACTOR PUMP STATION 1. NOT ALL MATERIALS FOR CONSTRUCTION ARE LISTED. SMALL ITEMS SUCH AS GROUT,CONCRETE, <br /> 218 EA 1 3"NPT X QUICK CONNECT TRANSITION FITTING. CONTRACTOR PUMP STATION REBAR,BOLTS,BUSHINGS,SEALANT,ETC.ARE NOT LISTED. IT IS THE CONTRACTOR'S <br /> RESPONSIBILITY TO PROVIDE ALL MATERIALS REQUIRED TO COMPLETE THE PROJECT. <br /> 219 EA 4 6"PIPE BOLLARD,9 FEET LONG,SCH 40. CONTRACTOR PUMP STATION,PIPELINE 2. NO ELECTRICAL MATERIALS ARE LISTED. <br /> DISCHARGE 3. SUBMIT SHOP DRAWINGS TO ENGINEER FOR APPROVAL BEFORE PURCHASE. <br /> VALVES 4. SUBMIT PRODUCT DATA TO ENGINEER FOR APPROVAL IN ACCORDANCE WITH THE SPECIFICATIONS. <br /> 1/2"NPT COMBINATION AIR VALVE,1"DEZURIK/APCO ASU COMBINATION AIR VALVE W/1" 5. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITEMS AND QUANTITIES IN MATERIAL LIST ABOVE. <br /> 300 EA 1 TO 1/2"NPT BUSHING,ALL 316 SS CONSTRUCTION. CONTRACTOR PUMP STATION <br /> 301 EA 1 3"BURIED SERVICE GATE VALVE,MUELLER MODEL A-2362,FLANGED ENDS,2"NUT,RIGHT CONTRACTOR PIPELINE DRAIN <br /> OPEN <br /> 302 EA 2 1/2"NPT BALL VALVE,316 SS,LEVER HANDLE,APOLLO MODEL 76F OR EQUAL. CONTRACTOR PUMP STATION <br /> in 303 EA 1 3"NPT BALL VALVE,316 SS,LEVER HANDLE,APOLLO MODEL 76F OR EQUAL. CONTRACTOR PUMP STATION <br /> 304 EA 1 2"NPT BALL VALVE,316 SS,LEVER HANDLE,APOLLO MODEL 76F OR EQUAL. CONTRACTOR PUMP STATION <br /> 0 305 EA 1 3"NPT Check Valve,In-line Spring Assisted,Durachoice Model VCSL1-200,316 SS CONTRACTOR PUMP STATION <br /> 306 EA 1 2"NPT Check Valve,In-line Spring Assisted,Durachoice Model VCSL1-300,316 SS CONTRACTOR PUMP STATION <br /> E <br /> - PUMP STATION EQUIPMENT AND INSTRUMENTS <br /> 0 <br /> NO. DATE MADE BY CKD.BY REMARKS "This drawing together with any and a//additions, <nDR NCNO REFERENCE <br /> Climax Molybdenum Climax Mine <br /> A 06/23 SAA SMM ISSUE FOR BIDDING corrections, changes and alterations thereof is the ryf 5 DAM SEEPWATER COLLECTION AREA <br /> Z A 08/23 SAA SMM ISSUE FOR CONSTRUCTION property of Climax Molybdenum Company and is p Ch/178X Molybdenum Climax,CO <br /> p furnished on the express condition that it shah w A Freeport-McMoRan Company SECONDARY CONTAINMENT SYSTEM 01/23 �9V N"Mdr" <br /> In not be reproduced copied, lent, or disposed of U SAA 1051.19.17 <br /> j directly or indirectly, nor used for any other w 3�0❑s.iNca sTQeeT DRAWING NO. <br /> W purpose than for which it is specifically furnished w W.fit.WHEELER eNcrcw000,c❑ eol 1❑-34os MATERIAL LIST SMM 01/23 <br /> Without the prior Written consent of said Climax w & ASSOCIATES, INC 303-761-41 30 w,�rw ro dv <br /> Molybdenum Company" ,,,a,e,Re5O,1fCe5 es 6-807-00111 <br /> 0 <br />