Laserfiche WebLink
® Climax Mine <br /> Climax Molybdenum <br /> Highway 91 - Fremont Pass <br /> 0429 <br /> A Freeport-McMoRan Company climax, ) 4 87718 <br /> p p y Phone {719) 486-7718 <br /> Fax (719) 486-2251 <br /> September 13, 2023 <br /> Mr. Dustin Czapla, Environmental Protection Specialist <br /> Colorado Division of Reclamation, Mining and Safety <br /> 1313 Sherman St., Rm. 215 <br /> Denver, CO 80203 <br /> Re: TR-36 Adequacy Review Response—Climax Mine Permit No. M-1977-493 <br /> Dear Mr. Czapla: <br /> The purpose of this letter is to provide additional information requested in DRMS's August 3, 2023, TR-36 <br /> Adequacy Review. The Division's comments are in italics with Climax's response following. <br /> 1. As indicated by Climax, the Environmental Protection Plan (EPP) will be inadequate and will <br /> need to be revised. Pursuant to Rule 7.2.8, a revised EPP shall be submitted in the form of a <br /> Technical Revision with the Required Revision Fee by December 15, 2023. <br /> Climax commits to updating the EPP in the form of a Technical Revision and will contain the <br /> required information for an Environmental Protection Facility. The submittal will include the <br /> required fee and be submitted by December 15, 2023. <br /> 2. in conjunction with the updated EPP to be submitted by December 15, 2023, please submit <br /> updated/revised Reclamation Plan and Maps as it pertains to this Environmental Protection <br /> Facility(EPF). As well as any other features that have been modified to ensure the Plan and <br /> Map(s) accurately reflect site conditions pursuant to C.R.S. 34-32-112(3). <br /> Climax commits to submitting updated/revised Reclamation Plan and Maps in conjunction with <br /> the EPP update. <br /> 3. The originally submitted narrative including the bullet point key project elements list does not <br /> provide enough detail to accurately characterize the scope, purpose, and function of the <br /> proposed EPF. Please provide a more detailed narrative, supported by additional and revised <br /> drawings, discussing all aspects of the proposed EPF, pursuant to Rule 6.4.21(7). Please also <br /> include directional flow arrows on all revised figures. <br /> The attached narrative has been revised to include additional detail on the scope, purpose, and <br /> function of the proposed EPF. Revised drawings are also included with directional flow arrows <br /> where appropriate. <br /> 4. Please state where the three spoil piles and one topsoil pile which need to be relocated will be <br /> placed. (Per drawing##6-807-00102 and##6-80 7-00 1 06) What is the estimated volume of the three <br /> spoil piles needing to be removed? <br /> The three spoil piles depicted on Drawing Nos. 6-807-00102 and 6-807-00106 are artifacts from <br /> when the topography was last flown and have been previously removed. The topsoil pile has <br /> also been relocated to adjacent to 5-Dam in preparation for spreading onto an un-reclaimed area <br /> of the dam face in 2024. <br />