My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-02-21_PERMIT FILE - C1981019A (9)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2023-02-21_PERMIT FILE - C1981019A (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2025 1:59:14 PM
Creation date
9/12/2023 3:14:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
2/21/2023
Doc Name
Emergency Spillway, Temporary and Permanent Channel Designs, Existing Structures
Section_Exhibit Name
Exhibit 07 Item 14 Emergency Spillway, Temporary and Permanent Channel Designs, Existing Structures
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Flow, Q Slope, % <br />Bottom <br />Width <br />Side Slope, <br />H:1V <br />Rip Rap, <br />D50, in <br />(All segments ex. Coal Road Ditch designed for 100 yr storm; WP Coal Rd Ditch designed for 10 year storm) <br />West Pit Fill Ditch, Sta 0 to 2 169.9 17.0 10.0 3.0 21 <br />West Pit Fill Ditch, Sta 2 to 10 158.2 25.0 10.0 3.0 24 <br />West Pit Fill Ditch, Sta 10 to 31 108.0 10.0 10.0 3.0 12 <br />West Pit Coal Road Ditch, Sta 0 to 21 19.2 10.0 10.0 3.0 Veg. <br />East Taylor Pond Ditch, Sta 0 to 30 50.2 3.5 0.0 3.0 Veg. <br />West Pit Fill Ditch & East Taylor Pond Ditch <br />Exhibit 7, Item 14, Table 1 <br />Summary of Ditch and Channel Design Parameters <br />Note: For permanent and temporary channels in the West Pit, East Pit, and South Taylor area please see <br />appliacble appendices in Volumes 2B, 2C, 2D, 2E, and 13.Exh7-14FExh. 7-14-6 <br />Revision Date: 12/13/22 <br />Revision No. TR-158
The URL can be used to link to this page
Your browser does not support the video tag.