Laserfiche WebLink
Truck/Loader Worksheet Cont’d Task # 075 Page 3 of 3 <br /> <br />CIRCES Cost Estimating Software <br />Haul Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 8000.00 -2.00 3.00 1.00 3503 2.875 <br />Haul Time: 2.875 minutes <br />Return Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 8000.00 2.00 3.00 5.00 3296 3.079 <br />Return Time: 3.079 minutes <br />Total Truck Cycle Time: 9.372 minutes <br />Loading Tool unit <br />Production <br /> <br />4,730.51 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />3,926.32 <br /> <br />LCY/Hour <br />Truck Unit Production <br />1,119.67 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />929.33 <br /> <br />LCY/Hour <br /> <br />Optimal No. of Trucks: <br /> <br />4 <br /> <br />Truck(s) <br /> <br />Selected Number of Trucks: <br /> <br />4 <br /> <br />Truck(s) <br />Adjusted hourly truck team production: 3,717.32 LCY/Hour <br />Adjusted single truck/loader team production: 3,717.32 LCY/Hour <br />Adjusted multiple truck/loader team production: 7,434.64 LCY/Hour <br /> <br />JOB TIME AND COST <br />Fleet size: 2 Team(s) Total job time: 70.45 Hours <br /> <br />Unit cost: <br /> <br />$1.403 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$734,951 <br />