Laserfiche WebLink
Truck/Loader Worksheet Cont’d Task # 071 Page 3 of 3 <br /> <br />CIRCES Cost Estimating Software <br />Haul Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 3000.00 2.00 3.00 5.00 1550 2.205 <br />Haul Time: 2.205 minutes <br />Return Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 3000.00 -2.00 3.00 1.00 3503 1.097 <br />Return Time: 1.097 minutes <br />Total Truck Cycle Time: 6.720 minutes <br />Loading Tool unit <br />Production <br /> <br />4,730.51 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />3,926.32 <br /> <br />LCY/Hour <br />Truck Unit Production <br />1,561.52 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />1,296.06 <br /> <br />LCY/Hour <br /> <br />Optimal No. of Trucks: <br /> <br />3 <br /> <br />Truck(s) <br /> <br />Selected Number of Trucks: <br /> <br />3 <br /> <br />Truck(s) <br />Adjusted hourly truck team production: 3,888.19 LCY/Hour <br />Adjusted single truck/loader team production: 3,888.19 LCY/Hour <br />Adjusted multiple truck/loader team production: 7,776.38 LCY/Hour <br /> <br />JOB TIME AND COST <br />Fleet size: 2 Team(s) Total job time: 135.49 Hours <br /> <br />Unit cost: <br /> <br />$1.223 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$1,288,494 <br />