Laserfiche WebLink
Truck/Loader Worksheet Cont’d Task # 067 Page 3 of 3 <br /> <br />CIRCES Cost Estimating Software <br />Haul Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 3400.00 0.00 3.00 3.00 2409 1.949 <br />Haul Time: 1.949 minutes <br />Return Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 3400.00 0.00 3.00 3.00 3503 1.348 <br />Return Time: 1.348 minutes <br />Total Truck Cycle Time: 6.715 minutes <br />Loading Tool unit <br />Production <br /> <br />4,730.51 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />3,926.32 <br /> <br />LCY/Hour <br />Truck Unit Production <br />1,562.68 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />1,297.03 <br /> <br />LCY/Hour <br /> <br />Optimal No. of Trucks: <br /> <br />3 <br /> <br />Truck(s) <br /> <br />Selected Number of Trucks: <br /> <br />3 <br /> <br />Truck(s) <br />Adjusted hourly truck team production: 3,891.08 LCY/Hour <br />Adjusted single truck/loader team production: 3,891.08 LCY/Hour <br />Adjusted multiple truck/loader team production: 7,782.17 LCY/Hour <br /> <br />JOB TIME AND COST <br />Fleet size: 2 Team(s) Total job time: 3.56 Hours <br /> <br />Unit cost: <br /> <br />$1.222 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$33,897 <br />