Laserfiche WebLink
EXHIBIT 13C <br />Volume 20 Page 6 Revision Date: 4/20/22 <br />Revision No.: TR-153 <br />Table 13C-4 Regrade Volumes for Collom Haul Road <br />Station <br />From To Avg. Haul <br />Distance (ft) Avg. Grade (%) Volume <br />(Cubic Yards) <br />00+00 208+00 1,045 2.0 394,559 <br />208+00 282+00 4,290 0.8 444,448 <br />282+00 395+00 5,093 4.6 292,294 <br />Table 13C-5 Topsoil Replacement for Collom Haul Road <br />Station <br />From To Avg. Haul <br />Distance (ft) Avg. Grade (%) Volume <br />(Cubic Yards) <br />112+26 149+00 2,000 2.0 38,194 <br />149+00 222+20 2,650 2.0 92,225 <br />222+20 242+00 700 -3.0 12,224 <br />242+00 275+20 1,150 -4.5 26,098 <br />275+20 298+10 2,000 -5.75 33,588 <br />298+10 336+00 1,380 -6.0 38,534 <br />336+00 396+89 2,100 2.0 79,658 <br />Note: Stations 336+00 to 396+89 volume includes the Section 25, Middle, Section 36 Ponds. <br />Stations 149+00 to 222+20 volume includes Jubb Creek Access Road, Temporary Facilities <br />Area, Wilson Storage Pond and Temporary Facilities Pond. <br />Table 13C-6 Revegetation Requirements for Collom Haul Road <br />Acres Disturbed Acres to be Reseeded <br />233 233 <br />Note: Revegetation requirements includes the Collom Haul Road, Jubb Creek Access Road, <br />Wilson Storage Pond, Temporary Facilities Area, and East Side Access Road, Section 25 Pond, <br />Middle Pond, and Section 36 Pond.