My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-01-05_PERMIT FILE - C1981019 (13)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2023-01-05_PERMIT FILE - C1981019 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2023 8:24:18 AM
Creation date
9/12/2023 8:15:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Permit File
Doc Date
1/5/2023
Section_Exhibit Name
Rule 4 Performance Standards -ST
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 4 PERFORMANCE STANDARDS <br /> <br />South Taylor/Lower Wilson – Rule 4, Page 7 Revision Date: 11/23/21 <br /> Revision No.: TR-152 <br /> <br /> <br />4.05.14 – 4.05.18 Various Topics <br /> <br />These sections are addressed in the Volume 1. <br /> <br />4.06 TOPSOIL <br /> <br />The topsoil removal, storage, and redistribution plan for the disturbed area associated with the Lower Wilson <br />and South Taylor mining areas will follow the procedures described in Section 4.06 in Volume 1and as <br />described in Section 2.05.3 (5) and 2.05.4 (2) (d) of this Volume (Volume 12).. <br /> <br />4.07 SEALING OF DRILLED HOLES AND UNDERGROUND OPENINGS <br /> <br />Drill holes and underground openings will be sealed in accordance with the procedures outlined in the Section <br />4.07 in Volume 1. <br /> <br />4.08 USE OF EXPLOSIVES <br /> <br />Explosives will be used for blasting in accordance with the procedures and specifications presented in <br />Volume 1, Section 4.08.. Map 26A presents distances to various structures of possible concern surrounding <br />the mining area. Only Section 4.08.2 has changed from Volume 1; see Sections 4.08.1 and 4.08.3 through <br />4.08.6, in Volume 1. <br /> <br />4.08.2 Pre-Blast Survey <br /> <br />In accordance with Rule 4.08.2(1), pre-blast surveys have been offered to owners of all structures within one- <br />half mile of the permit area. Pre-blast surveys were conducted on residential structures located at 6647 and <br />7072 Moffat County Road 51, various associated groundwater supply wells, and eleven power pole <br />foundations located along the ridge between Wilson and Taylor Creeks. Copies of the surveys are included in <br />Exhibit 14, Item 4. <br /> <br />4.09 DISPOSAL OF EXCESS SPOIL <br /> <br />Spoil removed from the South Taylor pit will be stockpiled as shown on Maps 45 and 20B. Colowyo expects <br />a 20% swell of excavated materials; therefore, part of the material stockpiled in the East and West Taylor Fills <br />will remain at the conclusion of the project as shown on Map 19. Placement will occur as described in <br />previous sections of this volume and in Volume 1. <br /> <br />Design of the two (East Taylor and West Taylor) fills associated with the South Taylor Mine plan are <br />provided in Exhibit 21. The East Taylor Fill will contain approximately 26.6 million yards of temporary out- <br />of-pit spoil and approximately 7.5 million yards of permanent out-of-pit spoil. The West Taylor Fill will <br />contain approximately 10.9 million yards of temporary out-of-pit spoil and approximately 22.6 million yards <br />of permanent out-of-pit spoil. Both fills will be regraded in accordance with the approved post mine <br />topography shown on Map 19. The final configuration of the fills is designed to minimize erosion. This <br />takes into account a number of the components of the other fill piles at the mine, which have proven <br />successful. The final outslope will not exceed 3h:1v. <br /> <br />Fill Name Temporary Volume Permanent Volume <br />East Taylor Fill 26,663,608 Cubic Yards 7,511,137 Cubic Yards <br />West Taylor Fill 10,993,667 Cubic Yards 22,609,016 Cubic Yards <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.