Laserfiche WebLink
RULE 3 PERFORMANCE BOND <br />RULE 3 - PERFORMANCE BOND <br />The performance bond calculations for the entire Colowyo mining operation can be found in Exhibit 13A <br />in Volume 13. The cumulative bond schedule for the Collom mining area can be found Exhibit 13C in <br />Volume 20. The Bond Calculation Maps showing the Worst Case Topography and Regraded <br />Topography are included as Map 35A and Map 36A, respectively. Bond Calculation Cross Sections are <br />provided on Map 40A. <br />South Taylor/Lower Wilson—Rule 3,Page 1 Revision Date: 4/14/22 <br />Revision No.: RN-08