My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-01-05_PERMIT FILE - C1981019A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2023-01-05_PERMIT FILE - C1981019A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2023 3:12:50 PM
Creation date
9/12/2023 7:16:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
1/5/2023
Section_Exhibit Name
Exhibit 13A Reclamation Cost Estimate
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
486
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Surface Blasting Work Cont’d Task# 001 Page 2 of 3 <br /> <br />CIRCES Cost Estimating Software <br /> <br /> <br />BLASTING MATERIALS QUANTITIES <br /> QUANTITY UNIT <br />Total Quantity of Stemming Required: 458.15 cubic yards <br />Total Quantity of Explosives Required: 376,420 pounds <br />Total Quantity of det. cord/fuse/wire Required: 56,815 linear feet <br />Quantity of Blasting Caps per Blasthole: 1 cap(s) <br />Total Quantity of Blasting Caps Required: 650 caps <br />Quantity of Primers per Blasthole: 1 primer(s) <br />Total Quantity of Primers Required: 650 primers <br />Quantity of Delays per Blasthole: 1 delay(s) <br />Total Quantity of Delays Required: 655 delays <br />HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Description <br />Drilling Equipment - Drill: Atlas Capco DML/SP - 9-7/8” <br />-Drill Pad Preparation: Cat D11T - 11U <br />Misc. Drill Support Equipment: NA <br />Misc. Explosives Support Equipment: NA <br />Explosives Delivery –Bulk Truck: ANFO Bulk Delivery Truck <br />-Cap Truck: Cap Delivery Truck <br /> <br /> Drilling Drill Pad Misc. Drill Misc. Expl. Explosives Delivery <br />Cost Breakdown: Equipment Preparation Support Support Bulk Truck Cap Truck <br /> Drilling Dozer MiscTruck MiscTruck <br />%Utilization-machine: 100 100 NA NA 100 100 <br />Ownership cost/hour: $365.54 $257.09 NA NA $104.62 $4.58 <br />Operating cost/hour: $290.40 $273.21 NA NA $153.49 $29.40 <br />%Utilization-ripper: NA NA NA NA NA NA <br />Ripper own. cost/hour: NA $0.00 NA NA $0.00 $0.00 <br />Ripper op. cost/hour: NA $0.00 NA NA $0.00 $0.00 <br />Operator cost/hour: $74.97 $41.30 NA NA $27.55 $27.55 <br />Unit Subtotals: $730.91 $571.60 $0.00 $0.00 $285.66 $61.53 <br />Number of Units: 1 1 0 0 1 1 <br />Group Subtotals: $730.91 $571.60 $0.00 $0.00 $285.66 $61.53 <br />Total work team cost/hour: $1,649.70 <br />MATERIALS COST <br /> Description Unit Unit Cost Quantity Total Cost <br />Blasting Agent: <br />Bulk ANFO nom. density ( <br />7,900-15,000 fps ) Pound $0.690 376420.236 $259,729.96 <br />Primers or Boosters: <br />Cast primer, 1.0 lb (electric <br />or non-electric system) Each $8.480 650.000 $5,512.00 <br />Blasting Caps: <br />Electric cap, delay (electric <br />systems) Each $11.660 650.000 $7,579.00 <br />Det. Cord, fuse, or <br />wire: <br />Detonating cord, 25 gr./ft. <br />(non-electric systems) Linear foot $0.330 56815.000 $18,748.95 <br />Delays: <br />MS connectors (non- <br />electric systems) Each $8.520 655.000 $5,580.60 <br />Miscellaneous: <br />Stemming, 1.5 in. gravel <br />(inert blasthole packing- <br />imported) Cu. yd. $31.400 458.150 $14,385.91
The URL can be used to link to this page
Your browser does not support the video tag.