Laserfiche WebLink
COLORADO <br /> Cg ihmd Division of Reclamation, <br /> ® Mining and Safety <br /> Department of Natural Resources <br /> September 11,2023 <br /> Byzantine Quarry,LLC <br /> Attn:Daniel Tezak <br /> 205 Tunnel Dr. <br /> Canon City,CO 81212 <br /> Re: M-2007-014,Byzantine Quarry, Succession of Operators Approval,Revision SO-2 <br /> Dear Mr.Tezak: <br /> On September 11,2023,the Division of Reclamation,Mining and Safety approved the succession of <br /> operators from Byzantine Quarry,LLC to Holcim-WCR,Inc. for this operation. Holcim-WCR,Inc. is <br /> now the permitted operator of Byzantine Quarry,and as such,is responsible for all provisions in M- <br /> 2007-014,as well as those specified in the Rules and Regulations. <br /> If you have any questions,please contact me at sara.stevenson-benn@state.co.us. <br /> Sincerely, <br /> 9;--� <br /> Sara Stevenson-Been <br /> Financial Warranty Specialist <br /> Enclosure <br /> Cc:Tim Cazier,DRMS <br /> Physical Address: 1313 Sherman Street, Room 215, Denver,CC 80203 P 3W.W6.3567 F 303.832.8106 I . <br /> Mailing Address:DRMS Room 215, 1001 E 62nd Ave, Denver,CC 8021fi https:ffdrms.colarado.eot+ ' <br /> ,fared S. Polis, Govemor Dan Gibbs, Executive Direcbx I Virginia Brannon, Director <br />