My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-09-07_REVISION - M1990057
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1990057
>
2023-09-07_REVISION - M1990057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2023 8:40:17 AM
Creation date
9/11/2023 9:13:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990057
IBM Index Class Name
Revision
Doc Date
9/7/2023
Doc Name Note
Response to Objection to Application
Doc Name
Response to Objection to Application
From
CJK Milling
To
DRMS
Type & Sequence
CN2
Email Name
LJW
THM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Welborn Sullivan Meck&Tooley&Leadville Sanitation 8 <br /> June 9,2023 <br /> low level ug/L limits. JVA recommends the testing and reporting of all metals for the Mill <br /> be changed to ug/L for low level metals analysis. <br /> Response: <br /> 8. The size of the FTD will not affect cyanide usage at the plant. Cyanide consumption is <br /> planned to be 4lbs/ton-ore, or O.8Otons/day, or 24.4tons/month. Cyanide will arrive on <br /> site in pellet form and will be stored in a sealed and secured facility, posing no threat to <br /> neighbors or the water supply. Also, tailing will go through a cyanide detoxification <br /> process before being deposited in the FTD. <br /> 9. UMC's FTD design considers: CUP offset requirements, Leadville Sanitation concerns <br /> with respect to proximity to WWTF areas (as well as proximity concerns by other <br /> neighbors). See figure below. The FTD design includes: <br /> o "located uphill and even closer to the District's polishing pond" <br /> The FTD is offset 250-ft from the corner of the Leadville Sanitation property <br /> corner. See Figure 2. This is shown by the yellow circle. This places the <br /> nearest corner of the FTD about 47Oft from the nearest portion of the polishing <br /> pond. (The south centerline of the FTD is about 56Oft from the nearest point on <br /> the polishing pond, which is slightly less than the original TSF- now the ECS). <br /> The original TSF was 575ft from the nearest portion of the polishing pond. <br /> The material will be placed on the FTD on a 4:1 slope to a maximum height of <br /> about 45ft-about the height of the existing trees. This means that the elevation of <br /> the tailings on the edge of the FTD will be Oft and will reach 45 vertical feet over <br /> a horizontal distance of 18Oft at the highest point. From the 47Oft distance <br /> shown in the figure, the FTD will reach a maximum height of about 3Oft over a <br /> distance of 12Oft. <br />
The URL can be used to link to this page
Your browser does not support the video tag.