Laserfiche WebLink
Burns Figa&Will 6 <br /> September 5,2023 <br /> CJK of the obligation to notify homeowners and be responsible for potential damages. It <br /> does NOTHING to address the concerns that have been raised during the last year. It <br /> appears to be an evasive tactic to absolve them of responsibility for the destruction they <br /> may inflict on the surrounding community. <br /> It is unfortunate that CC41-C see this as a disingenuous action. In fact, the intended action is a <br /> revision of the original Affected Area of the operation (see orange boundary) being modified to <br /> provide the Benson home with as much buffer (about 500ft from proposed FTD and other new <br /> construction and as far as possible from existing infrastructure) from the operation as possible <br /> (see red boundary). This concession, stemming from concerns raised during the previous <br /> amendment application process) resulted in CJK effectively sterilizing about 7 acres of its land. <br /> x <br /> Emergency Management Plan <br /> • This plan addresses employee injuries and fire but does not address chemical spills other <br /> than in the responsibilities section to report on the incident. This plan is fine for a facility <br />