My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-09-08_REVISION - M2006042
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2006042
>
2023-09-08_REVISION - M2006042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2023 8:42:12 PM
Creation date
9/11/2023 7:48:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006042
IBM Index Class Name
Revision
Doc Date
9/8/2023
Doc Name
Request For Amendment To Permit
From
MMM Partnership
To
DRMS
Type & Sequence
AM1
Email Name
NCG
AME
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-4- <br /> 12. Primarx future(Post-mining)land use check one): <br /> Cropland(CR) Pastureland(PL) r] General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) Solid Waste Disposal(WD) <br /> 13. Primary resent land use check one): <br /> DCropland(CR) `� Pastureland(PL) General Agriculture(GA) <br /> II Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Surface mining using Dozer, Front end loader, Screen <br /> 15. On Site Processing: F Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> This is currently a 112c miningpermit. Reclamation is partially complete on the existing 27.8 <br /> acres. a partial release application has been filed and inspected. the anticipated release area is <br /> that has been processed and waiting export. Once the final mining is complete the remaining <br /> area will e sloped, opsoi a and reclaimed. a then will begin material extraction in the new <br /> proposed area after the site has been approved for mining. <br />
The URL can be used to link to this page
Your browser does not support the video tag.