Laserfiche WebLink
central portion of the South London Stockpile,the stormwater berm,as shown within Detail 2,will be <br /> installed in a phased approach as the stockpile is removed. <br /> Within the Processing Area,the site will be graded to the north where stormwater collects in a ditch and <br /> flows to a small sediment pond in the northeast corner of the area before discharging into the off-site <br /> CDPS Pond. <br /> As native soil horizons are uncovered,the fine material will be excavated and stockpiled around the <br /> American Shaft area both as fill for the water-filled collapse area and for subsequent use for final cover. <br /> Upon completion of the repository at the South London Stockpile,3"of fine-grained growth medium will <br /> be placed as final cover to enhance revegetation success and re-vegetated with the approved native <br /> seed mix. <br /> If sufficient fine-grained cover is not located around the South London Stockpile footprint,fine grained <br /> material will be imported to achieve at least 3"of cover over the South London Stockpile area. <br />