Laserfiche WebLink
Scraper Worksheet Cont'd Task#51B Page 1 of 2 <br /> SCRAPER TEAM WORK <br /> Task description: Replace topsoil on Pond 009 <br /> Site: New Horizon Mine Permit Action: RN8r Permit/Job#: C1981008 <br /> PROJECT IDENTIFICATION <br /> Task#: 51B State: Colorado Abbreviation: None <br /> Date: 8/7/2023 County: Montrose Filename: C008-51B <br /> User: CCW <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShiftbasis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 631G <br /> -Dozer: Cat D9T-9SU <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: NA <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 100 NA NA NA NA <br /> Ownership cost/hour: $341.67 $238.76 NA NA NA NA <br /> Operating cost/hour: $285.26 $162.29 NA NA NA NA <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own. cost/hour: NA $0.00 NA NA NA NA <br /> Ripper op. cost/hour: NA $0.00 NA NA NA NA <br /> Operator cost/hour: $30.90 $41.30 NA NA NA NA <br /> Unit Subtotals: $657.83 $442.35 NA NA NA NA <br /> Number of Units: 2 1 0 0 0 0 <br /> Group Subtotals: Work: $1,758.01 Support: $0.00 Maine $0.00 <br /> Total work team cost/hour: $1,758.01 <br /> MATERIAL QUANTITIES <br /> Initial volume: 3,017 CCY Swell factor: 1.100 <br /> Loose volume: 3,319 LCY <br /> Source of estimated volume: 1.02 acres,22"depth <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 2,100 lbs/LCY Struck Volume: 24.00 LCY <br /> Material description: User Provided Heaped Volume: 34.00 LCY <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 38.86 LCY Adjusted Capacity: 29.00 LCY <br /> CIRCES Cost Estimating Software <br />