Laserfiche WebLink
Bulldozer Worksheet Cont'd Task# 102 Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Replace 403 CY Litt A TS S of Pond 13(MR-121) <br /> Site: New Horizon Mine Permit Action: RN8r Permit/Job#: C1981008 <br /> PROJECT IDENTIFICATION <br /> Task#: 102 State: Colorado Abbreviation: None <br /> Date: 8/7/2023 County: Montrose Filename: C008-102 <br /> User: CCW <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU <br /> Horsepower: 310 <br /> Blade Type: Semi-Universal <br /> Attachment: NA <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $241.38 NA <br /> Operating Cost/Hour: $143.92 100 <br /> Ripper own. $0.00 NA <br /> Cost/Hour: <br /> Ripper op. Cost/Hour: $0.00 0 <br /> Operator Cost/Hour: $41.30 NA <br /> Total unit Cost/Hour: $426.60 <br /> Total Fleet Cost/Hour: $426.60 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 403 <br /> Swell factor: 1.000 <br /> Loose volume: 403 LCY <br /> Source of estimated volume: Division of Reclamation,Mining& Safety <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 50 feet <br /> Unadjusted hourly 1,400.0 LCY/hr <br /> production: <br /> Materials consistency description: Loose stockpile 1.2 <br /> Average push -5 % <br /> gradient: <br /> Average site altitude: 5,600 feet <br /> Material weight: 2,550 lbs/LCY <br /> Weight description: Earth-Dry packed <br /> Job Condition Correction Factor Source <br />