Laserfiche WebLink
Mobilization Worksheet Cont'd Task#076 Page 2 of 2 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: GRAND JUNCTION <br /> Total one-way travel distance: 110.00 miles <br /> Average Travel Speed: 45.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $10,023.03 <br /> `*two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost** <br /> **one round trip,no haul rig: $0.00 <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 2.44 2.44 <br /> Return Time(Hours): 2.44 2.44 <br /> Loading Time(Hours): 4.00 NA <br /> Unloading Time(Hours): 4.00 NA <br /> Subtotals: 12.89 4.89 <br /> JOB TIME AND COST <br /> Total job time: 25.78 Hours <br /> Totaljob cost: S10,023 <br /> CIRCES Cost Estimating Software <br />