Laserfiche WebLink
Page 1 of 2 <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Mobilize equipment for inital reclamation-breakdown req'd <br /> Site: New Horizon Mine Permit Action: RN8r Permit/Job#: C1981008 <br /> PROJECT IDENTIFICATION <br /> Task#: 075 State: Colorado Abbreviation: None <br /> Date: 8/7/2023 County: Montrose Filename: C008-075 <br /> User: CCW <br /> Agency or organization name: Colorado Division of Reclamation,Mining and Safety <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT <br /> TRAILER(25T, 50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownership Cost/Hour: $20.26 $36.04 $47.05 <br /> Operating Cost/Hour: $39.51 $76.08 $82.85 <br /> Operator Cost/Hour: $22.52 $22.52 $22.52 <br /> Helper Cost/Hour: $0.00 $23.53 $23.53 <br /> Total Unit Cost/Hour: $82.29 $158.17 $175.95 <br /> NON ROADABLE EQUIPMENT. <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/uni Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) t fleet <br /> CatD9T-9SU 60.01 $238.76 $175.95 2 $829.42 $351.90 $500.00 <br /> CAT 14M 23.57 $149.33 $82.29 1 $231.62 $82.29 $500.00 <br /> Cat773F 49.74 $150.99 $158.17 4 $1,236.64 $632.68 $1,000.00 <br /> CAT 988H 54.46 $109.98 $175.95 1 $285.93 $175.95 $250.00 <br /> CAT 825H 36.08 $273.16 $158.17 1 $431.33 $158.17 $250.00 <br /> Subtotals: I $3,014.94 $1,400.99 $2,500.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/fleet Cost/hr/fleet <br /> Subtotals: $0.00 $0.00 <br /> CIRCES Cost Estimating Software <br />