Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#060 Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Regrade Lincoln Street Haul Road <br /> Site: New Horizon Mine Permit Action: RN8r Permit/Job#: C1981008 <br /> PROJECT IDENTIFICATION <br /> Task#: 060 State: Colorado Abbreviation: None <br /> Date: 8/7/2023 County: Montrose Filename: C008-060 <br /> User: CCW <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D10T- IOSU <br /> Horsepower: 574 <br /> Blade Type: Semi-Universal <br /> Attachment: NA <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $178.69 NA <br /> Operating Cost/Hour: $160.22 100 <br /> Ripper own. $0.00 NA <br /> Cost/Hour: <br /> Ripper op. Cost/Hour: $0.00 0 <br /> Operator Cost/Hour: $41.30 NA <br /> Total unit Cost/Hour: $380.21 <br /> Total Fleet Cost/Hour: $380.21 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 2,734 <br /> Swell factor: 1.125 <br /> Loose volume: 3,076 LCY <br /> Source of estimated volume: Division of Reclamation,Mining& Safety <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 100 feet <br /> Unadjusted hourly 1,718.9 LCY/hr <br /> production: <br /> Materials consistency description: Compacted fill or embankment 0.9 <br /> Average push 0% <br /> gradient: <br /> Average site altitude: 5,000 feet <br /> Material weight: 2,650 lbs/LCY <br /> Weight description: Decomposed rock-25%Rock,75%Earth <br /> Job Condition Correction Factor Source <br />