My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-08-30_BONDING - C1981008
DRMS
>
Day Forward
>
Bonding
>
Coal
>
C1981008
>
2023-08-30_BONDING - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2023 10:06:39 AM
Creation date
9/5/2023 10:04:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Bonding
Doc Date
8/30/2023
Doc Name Note
Findings & Cost Estimate
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Elk Ridge Mining and Reclamation, LLC
Type & Sequence
RN8
Email Name
CCW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task#031 Page 1 of 2 <br /> SCRAPER TEAM WORK <br /> Task description: Replace topsoil on 34.6 acre stockpile area(SE Sec 6) <br /> Site: New Horizon Mine Permit Action: RN8r Permit/Job#: C1981008 <br /> PROJECT IDENTIFICATION <br /> Task#: 031 State: Colorado Abbreviation: None <br /> Date: 8/7/2023 County: Montrose Filename: C008-031 <br /> User: CCW <br /> Agency or organization name: Colorado Division of Reclamation,Mining and Safety <br /> HOURLY EQUIPMENT COSTShiftbasis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 631G <br /> -Dozer: Cat D9T-9SU <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance-Motor Grader: CAT 14M <br /> -Water Truck: Water Tanker, 5,000 Gal. <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 100 NA NA 50 50 <br /> Ownership cost/hour: $341.67 $238.76 NA NA $149.33 $57.13 <br /> Operating cost/hour: $285.26 $162.29 NA NA $46.40 $33.25 <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own. cost/hour: NA $0.00 NA NA $0.00 $0.00 <br /> Ripper op. cost/hour: NA $0.00 NA NA $0.00 $0.00 <br /> Operator cost/hour: $30.90 $41.30 NA NA $28.56 $0.00 <br /> Unit Subtotals: $657.83 $442.35 NA NA $224.28 $90.38 <br /> Number of Units: 4 2 0 0 1 1 <br /> Group Subtotals: Work: $3,516.02 Support: $0.00 Maine $314.66 <br /> Total work team cost/hour: $3,830.68 <br /> MATERIAL QUANTITIES <br /> Initial volume: 85,477 CCY Swell factor: 1.100 <br /> Loose volume: 94,025 LCY <br /> Source of estimated volume: Map 2.05.4-4, 26.15 ac(34.6-8.45 Ph II) 28"depth <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 2,100 lbs/LCY Struck Volume: 24.00 LCY <br /> Material description: User Provided Heaped Volume: 34.00 LCY <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 38.86 LCY Adjusted Capacity: 29.00 LCY <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.