My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-08-30_BONDING - C1981008
DRMS
>
Day Forward
>
Bonding
>
Coal
>
C1981008
>
2023-08-30_BONDING - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2023 10:06:39 AM
Creation date
9/5/2023 10:04:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Bonding
Doc Date
8/30/2023
Doc Name Note
Findings & Cost Estimate
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Elk Ridge Mining and Reclamation, LLC
Type & Sequence
RN8
Email Name
CCW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEMOLITION WORK <br /> Task description: Remove culverts and pond dewatering pipes <br /> Site: New Horizon Mine Permit Action: RN8r Permit/Job#: C1981008 <br /> PROJECT IDENTIFICATION <br /> Task#: 021 State: Colorado Abbreviation: None <br /> Date: 8/7/2023 County: Montrose Filename: C008-021 <br /> User: CCW <br /> Agency or organization name: DRMS <br /> UNIT COSTS Location adjustment: 85.90% <br /> Structure or Item Demolition Menu <br /> Description Dimensions Selection Quantity Unit Unit Total Cost <br /> Cost <br /> Culvert 138 18 in. x 60 ft. Pipe,corrugated metal 60.00 LF $5.94 $356.32 <br /> (CMP)- 18 in. diameter <br /> pipe <br /> Culvert 175 24 in. x 60 ft. Pipe,corrugated metal 60.00 LF $7.73 $463.72 <br /> (CMP)- 24 in. diameter <br /> pipe <br /> Culvert 176 18 in. x 90 ft. Pipe,corrugated metal 90.00 LF $5.94 $534.47 <br /> (CMP)- 18 in. diameter <br /> pipe <br /> Culvert 177 18 in. x 20 ft. Pipe,corrugated metal 20.00 LF $5.94 $118.77 <br /> (CMP)- 18 in. diameter <br /> pipe <br /> Culvert 179 16 in. x 140 ft. Pipe,corrugated metal 140.00 LF $5.94 $831.40 <br /> (CMP)- 18 in. diameter <br /> pipe <br /> Culvert 180 18 in. x 40 ft. Pipe,corrugated metal 40.00 LF $5.94 $237.54 <br /> (CMP)- 18 in. diameter <br /> pipe <br /> Pond 012 dewatering 18 in. x 25 ft. Pipe,corrugated metal 25.00 LF $5.94 $148.47 <br /> structure (CMP)- 18 in. diameter <br /> pipe <br /> Pond 013 dewatering 18 in. x 25 ft. Pipe,corrugated metal 25.00 LF $5.94 $148.47 <br /> structure (CMP)- 18 in. diameter <br /> pipe <br /> Total Cost <br /> Subtotal (adjusted for <br /> Job Hours: 3.00 (unadjusted): $2,839.16 location): $2,438.84 <br />
The URL can be used to link to this page
Your browser does not support the video tag.