Laserfiche WebLink
MOTOR GRADER WORK <br /> Task description: Rip spoil/topsoil interface <br /> Site: New Horizon Mine Permit Action: RN8r Permit/Job#: C1981008 <br /> PROJECT IDENTIFICATION <br /> Task#: 010 State: Colorado Abbreviation: None <br /> Date: 8/2/2023 County: Montrose Filename: C008-010 <br /> User: CCW <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: CAT 14M Horsepower: 259 <br /> Ripper Attachment: Multi-Shank Ripper Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $149.33 NA <br /> Operating Cost/Hour: $92.79 100 <br /> Ripper Ownership Cost/Hour: $5.83 NA <br /> Ripper Operating Cost/Hour: $4.02 100 <br /> Operator Cost/Hour: $28.56 NA <br /> Total Unit Cost/Hour: $280.53 <br /> Total Fleet Cost/Hour: $280.53 <br /> MATERIAL QUANTITIES <br /> Total Area to be graded or ripped: 117.30 acres <br /> Source of estimated acreage: C008 Permit Application and 2022 ARR <br /> HOURLY PRODUCTION <br /> Average Grader Speed: 1.50 mph <br /> Selected Application: Ripping(0-3 mph) - 1.50 <br /> Selected Blade Angle: -1 degrees <br /> Effective Blade Length: 0.00 feet <br /> Width of blade overlap per pass: 2.00 feet <br /> Net grading or ripping width per pass: 8.50 feet <br /> Unadjusted Hourly Unit Production: 1.5455 acres/hour <br /> Job Condition Correction Factors Site Altitude: 5700 feet <br /> Source <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.90 (1sh/d,fay.) <br /> Net Correction: 0.9000 multiplier <br /> Adjusted Hourly Unit Production: 1.3909 acres/Hour <br /> Adjusted Hourly Fleet Production: 1.3909 acres/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Grader(s) Total job time: 84.33 Hours <br /> Unit cost: $201.69 per acre Total job cost: $23,658 <br /> CIRCES Cost Estimating Software <br />