My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-08-30_BONDING - C1981008
DRMS
>
Day Forward
>
Bonding
>
Coal
>
C1981008
>
2023-08-30_BONDING - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2023 10:06:39 AM
Creation date
9/5/2023 10:04:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Bonding
Doc Date
8/30/2023
Doc Name Note
Findings & Cost Estimate
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Elk Ridge Mining and Reclamation, LLC
Type & Sequence
RN8
Email Name
CCW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Surface Blasting Work Cont'd Task#001 Page 2 of 3 <br /> BLASTING MATERIALS QUANTITIES <br /> QUANTITY UNIT <br /> Total Quantity of Stemming Required: 9.91 cubic yards <br /> Total Quantity of Explosives Required: 19,136 pounds <br /> Total Quantity of det. cord/fuse/wire Required: 13,345 linear feet <br /> Quantity of Blasting Caps per Blasthole: 1 cap(s) <br /> Total Quantity of Blasting Caps Required: 576 caps <br /> Quantity of Primers per Blasthole: 1 primer(s) <br /> Total Quantity of Primers Required: 576 primers <br /> Quantity of Delays per Blasthole: 1 delay(s) <br /> Total Quantity of Delays Required: 579 delays <br /> HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Description <br /> Drilling Equipment-Drill: ATLAS COPCO ROC D9-11,4.5 in. <br /> -Drill Pad Preparation: Cat D9T-9SU <br /> Misc.Drill Support Equipment: NA <br /> Misc.Explosives Support Equipment: NA <br /> Explosives Delivery—Bulk Truck: ANFO Bulk Delivery Truck <br /> -Cap Truck: NA <br /> Drilling Drill Pad Misc.Drill Misc.Expl. Explosives Delivery <br /> Cost Breakdown: Equipment Preparation Support Support Bulk Truck Cap Truck <br /> Drilling Dozer MiscTruck <br /> %Utilization-machine: 100 25 NA NA 15 NA <br /> Ownership cost/hour: $250.72 $238.76 NA NA $156.81 NA <br /> Operating cost/hour: $237.25 $40.57 NA NA $29.56 NA <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own.cost/hour: NA $0.00 NA NA $0.00 NA <br /> Ripper op. cost/hour: NA $0.00 NA NA $0.00 NA <br /> Operator cost/hour: $0.00 $41.30 NA NA $70.24 NA <br /> Unit Subtotals: $487.97 $320.63 $0.00 $0.00 $256.61 $0.00 <br /> Number of Units: 1 1 0 0 1 0 <br /> Group Subtotals: $487.97 $320.63 $0.00 $0.00 $256.61 $0.00 <br /> Total work team cost/hour: $1,065.21 <br /> MATERIALS COST <br /> Description Unit Unit Cost Quantity Total Cost <br /> Bulk ANFO nom. density <br /> Blasting Agent: (7,900-15,000 fps) Pound $0.718 19136.000 $13,739.65 <br /> Cast primer, 1.0 lb <br /> (electric or non-electric <br /> Primers or Boosters: system) Each $8.480 576.000 $4,884.48 <br /> Non-electric cap,delay <br /> Blasting Caps: (non-electric systems) Each $6.400 576.000 $3,686.40 <br /> Det. Cord,fuse,or Detonating cord, 10 gr./ft. <br /> wire: (non-electric systems) Linear foot $0.320 13345.200 $4,270.46 <br /> MS connectors(non- <br /> Delays: electric systems) Each $8.690 579.000 $5,031.51 <br /> Miscellaneous: 0.000 0 <br /> Drill bits: Bit life=2,600 Linear feet $1,369.73 1.772 $2,427.58 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.