Laserfiche WebLink
Findings of the Colorado Division of Reclamation, Mining and Safety <br /> for the <br /> New Horizon Mine <br /> Explanation of Findings <br /> Pursuant to Rule 2.07.6(2) of the Regulations of the Colorado Mined Land Reclamation Board for <br /> Coal Mining, and the approved state program, the Division of Reclamation, Mining and Safety or <br /> the Board must make specific written findings prior to issuance of a permit, permit renewal or <br /> permit revision. These findings are based on information made available to the Division that <br /> demonstrates that the applicant will be able to operate in compliance with the Colorado Surface <br /> Coal Mining Reclamation Act and the Regulations promulgated pursuant to the Act. <br /> The findings in the following sections required by Rule 2.07.6(2)are listed in accordance with that <br /> Rule. The findings and specific approvals required pursuant to Rule 2.07.6(2)(m) are listed in <br /> accordance with Rule 4 and are organized under subject or discipline subtitles. <br /> This findings document has been updated for this permit renewal (RN-8). The following findings <br /> have been reevaluated and updated if necessary to reflect changes which will occur as a result of <br /> this permit renewal application. <br /> Section A- Rule 2.07.6 <br /> 1. The permit application is accurate and complete. All requirements of the Act and these rules <br /> have been complied with (2.07.6(2)(a)). <br /> 2. Based on information contained in the permit application and other information available to <br /> the Division, the Division finds that surface coal mining and reclamation can be feasibly <br /> accomplished at New Horizon Mine (2.07.6(2)(b)). <br /> 3. The assessment of the probable cumulative impacts of all anticipated coal mining in the <br /> general area on the hydrologic balance, as described in 2.05.6(3), has been made by the <br /> Division. This assessment, entitled "Nucla Mine CHIS," is available for inspection at the <br /> offices of the Division. The Division finds that the operations proposed under the application <br /> have been designed to prevent damage to the hydrologic balance outside the proposed permit <br /> area. Please refer to Section B.III-H (Probable Hydrologic Consequences) of this document <br /> for additional discussion of the predicted hydrologic consequences of mining operations <br /> (2.07.6(2)(c)). <br /> 4. The Division finds that the permit area is, subject to valid rights existing as of August 3, <br /> 1977, not within: <br /> a) An area designated unsuitable for surface coal mining operations (2.07.6(2)(d)(i)); <br /> b) An area under study for designation as unsuitable for surface coal mining operations <br /> (2.07.6(2)(d)(ii)); <br /> 19 <br />