My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-08-30_HYDROLOGY - M2001046
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2001046
>
2023-08-30_HYDROLOGY - M2001046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2023 8:43:38 AM
Creation date
9/5/2023 8:40:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001046
IBM Index Class Name
Hydrology
Doc Date
8/30/2023
Doc Name
Substitute Water Supply Plan
From
Division Of Water Resources
To
DRMS
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Division has identified four approaches for operators: <br /> 1. File a financial warranty that will ensure backfilling of the pit to cover the exposed groundwater to a <br /> depth of two feet above the static ground water level or, <br /> 2. Obtain a court approved augmentation plan prior to exposing ground water or, <br /> 3. File a financial warranty to cover the cost of installing a clay liner or slurry wall that meets the <br /> Division of Water Resources requirements for preventing ground water exposure or, <br /> 4. Obtain approval from the Division of Water Resources'that acknowledges compliance with the SEO's <br /> requirements pursuant to§37-90-137(11). <br /> The Division will work with operators on an individual basis as they move to implement one of these plans. it <br /> Is likely that options 1 and 3 will require the submittal of a technical revision or an amendment to the existing <br /> permit depending on the nature of the current mining and reclamation plan and the proposed changes. <br /> Increased financial warranties,as a result of these modifications,may be posted In a phased manner not to <br /> exceed three years. Amendments or revisions currently under review will be required to be approved by <br /> April 30,2011 and may use the phased financial warranty approach described above. New applications going <br /> forward or presently under review by the Division will be required to meet the requirements of one of the <br /> options 1-4 at the time of application approval. Failure of affected operators to initiate_contact with the <br /> Division and gain.-compliance as described above could result In an enforcement action being issued by the: <br /> Division. <br /> If you have any questions,please contact Tony Waldron at 303-866-3567,extension 8150. <br /> cc: Permit Id Site Name <br />
The URL can be used to link to this page
Your browser does not support the video tag.