Laserfiche WebLink
i. Water recharged in the Haren Recharge facility under the decrees in Case <br /> Nos. 87CW304 and 05CW311 or water recharged under free river conditions. <br /> ii. Water stored in the 70 Ranch Reservoir under free river conditions or under <br /> the decree in Case No. 16CW3059. <br /> iii. Water stored in Milliken Reservoir under free river conditions or under the <br /> decree in Case No. 16CW3059. <br /> 2. Lease Period: This Lease shall begin on the Effective Date and shall expire on June <br /> 30, 2024. <br /> 3. Replacement Schedule: United shall make augmentation water available to RMCC <br /> based on the following monthly schedule. <br /> Replacement <br /> Requirement <br /> Month (AF) <br /> Jul 2023 0.1 <br /> Aug 2023 2.0 <br /> Sep 2023 5.6 <br /> Oct 2023 7.9 <br /> Nov 2023 9.3 <br /> Dec 2023 10.0 <br /> Jan 2024 10.3 <br /> Feb 2024 10.5 <br /> Mar 2024 10.5 <br /> Apr 2024 10.3 <br /> May 2024 10.3 <br /> Jun 2024 10.4 <br /> Total 97.1 <br /> 4. Operation, Maintenance and Repair. RMCC shall be responsible for its pro rata <br /> share of all costs related to the operation, utilities, monitoring, maintenance, and repair of those <br /> portions of the 70 Ranch Reservoir and Milliken Reservoir utilized by RMCC for storage. <br /> 5. Unneeded Water: RMCC's water requirements are based on future projections and <br /> will heavily depend on actual operations of the Nix facility. Should RMCC's actual depletions in <br /> any month be less than the volume noted in the Replacement Schedule, United may, at its <br /> discretion,use or retain any portion of water not needed to replace RMCC's actual depletions and <br /> invoice RMCC for only the volumes of water used by RMCC and not retained or used by United. <br /> Augmentation Water Lease Agreement <br /> Page 2of11 <br />