Laserfiche WebLink
ASX Release 23 February1 <br /> This announcement has been authorised for release on ASX by the Company's Board of Directors. <br /> For more information: <br /> Stephen Baghdadi Andrew Rowell <br /> Managing Director White Noise Communications <br /> +61 2 9375 2353 +61 400 466 226 <br /> www.datelineresources.com.au andrew@whitenoisecomms.com <br /> Follow Dateline on Twitter:If https://twitter.com/Dateline DTR <br /> About Dateline Resources Limited <br /> Dateline Resources Limited (ASX: DTR) is an Australian publicly listed company focused on gold mining and <br /> exploration in North America.The Company owns 100%of the Gold Links and Green Mountain Projects in <br /> Colorado, USA and 100%of the Colosseum Gold Mine in California. <br /> The Gold Links Gold Mine is a historic high-grade gold mining project where over 150,000 ounces of gold <br /> was mined from high-grade veins. Mineralisation can be traced on surface and underground for almost 6km <br /> from the northern to the southern sections of the project. <br /> The Company owns the Lucky Strike gold mill, located 50km from the Gold Links mine, within the Green <br /> Mountain Project.The plant is currently on care and maintenance. <br /> The Colosseum Gold Mine is located in the Walker Lane Trend in East San Bernardino County, California. <br /> On July 6, 2022, the Company announced to the ASX that the Colosseum Gold mine has a JORC-2012 <br /> compliant Mineral Resource estimate of 20.9Mt @ 1.2g/t Au for 813,OOOoz. Of the total Mineral Resource, <br /> 258koz @1.2g/t Au (32%) are classified as Measured, 322koz @1.2g/t Au (39%) as Indicated and 235koz <br /> @1.3g/t Au (29%) as Inferred. <br /> The Colosseum is located less than 10km north of the Mountain Rare Earth mine.Work has commenced on <br /> identifying the source of the mantle derived rocks that are associated with carbonatites and are located <br /> adjacent to the Colosseum mine. <br />