reclaimed. This task is associated with the same acreages in Task 009. The acres were updated to <br /> 117.3 acres. <br /> 9. Task 017: This Task had two additional wells to be reclaimed than what is currently at the mine site. <br /> These wells were removed from Task 017. <br /> 10. Task 022: Task 022 was to demolish the Hay Storage Shed. This facility was never constructed and <br /> the acres where the structure was to be located are no longer within the current permit boundary. <br /> Task 022 was removed from the estimate. <br /> 11. Task 068: The Fertilizer used at the New Horizon Mine is 60lbs/acre nitrogen (11-52-0) and 20 <br /> Ibs/acre phosphorus (46-0-0). CIRCES does not currently have these fertilizers as an option. <br /> Ammonium Nitrate was used instead at an application rate of 100 units per acre. <br /> 12. Task 069: The fertilizer subsection of Task 069 was removed. Dryland pasture does not require <br /> the use of fertilizers. Consultation with the operator indicated that there are 100 acres of land <br /> remaining associated with this task. The amount of acres was increased to 100 for Task 069. <br /> 13. Task 36A: The acreages associated with Task 36A were Phase III released from the permit. Task <br /> 36A was removed from the estimate. <br /> 14. Task 52B was removed from the estimate. There is no Pond 10 located within the C-1981-008 Permit <br /> Application Package. <br /> Sincerely,84* J <br /> Iv/ <br /> Clayton Wein <br /> Environmental Protection Specialist <br /> clayton.weing state.co.us <br /> cc: Travis Marshall, Senior Environmental Protection Specialist <br />