My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-08-22_HYDROLOGY - M2008017
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2008017
>
2023-08-22_HYDROLOGY - M2008017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2023 11:54:26 AM
Creation date
8/29/2023 10:58:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008017
IBM Index Class Name
Hydrology
Doc Date
8/22/2023
Doc Name
Water Monitoring - Groundwater
From
Broken Arrow Investements, LLC
To
DRMS
Report Quarter_Month
Aug
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Broken Arrow <br /> Z� Investments, LLC <br /> 801 8' Sheet, Suite 130 <br /> Greeley, CO 80631 <br /> August 22, 2023 <br /> Mr. Eric Scott <br /> Environmental Protection Specialist <br /> State of Colorado <br /> Division of Reclamation, Mining, & Safety <br /> 1313 Sherman Street— Room 215 <br /> Denver, CO 80203 <br /> RE: Broken Arrow Investments, LLC — File No. M-2008-017 Derr Pit — Summary for August <br /> Water Level Reporting <br /> Dear Mr. Scott, <br /> Broken Arrow Investments, LLC is providing this summary letter to discuss and provide information <br /> in regard to the August off-site an on-site monitor wells and provide the dewatering volumes <br /> pumped for July. <br /> During the month of July a total of 0.0 acre-feet was pumped and discharged into the on-site <br /> recharge ponds within the Derr Pit. <br /> AgPro was not able to get all the normal monthly readings/measurements on all of the off-site wells <br /> for the August readings as the Hoffner#2 Irrigation Well was being pumped for irrigation as well as <br /> the Bliss Irrigation Well. As discussed in our technical revision letter there are some on-site wells <br /> that were removed due to the slurry wall construction and those wells are no longer in place. <br /> Monitor Well 11 is no longer accessible and neither is Monitor Well 1. The on-site monitor wells saw <br /> increases and decreases in the elevation of the water levels. The water level elevations in the <br /> monitor wells on the Phase 1-4 portion of the pit went up on the south side by 0.69 feet and down <br /> by 0.07 feet on the north side. The water level elevations in the monitor wells on the upper terrace <br /> of the permit area increased by 0.49 feet for MW-14, decreased by 0.01 feet for MW-15, increased <br /> by 0.28 feet for MW-16, decreased by 0.59 feet for MW-17, and decreased by 0.48 feet for MW-18. <br /> Please give me a call at (970) 566-5090 or send an e-mail to discuss further. <br /> Sincerely, <br /> Kelly Hodge, Broken Arrow Investments, LLC <br />
The URL can be used to link to this page
Your browser does not support the video tag.