My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-09-06_PERMIT FILE - M2023032 (19)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2023032
>
2023-09-06_PERMIT FILE - M2023032 (19)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2023 10:04:16 AM
Creation date
8/28/2023 9:41:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2023032
IBM Index Class Name
Permit File
Doc Date
9/6/2023
Doc Name Note
Exhibit S - Permanent Man-Made Structures
Doc Name
Application
From
Martin Marietta Materials, Inc.
To
DRMS
Email Name
ANM
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Phillip Courtney <br /> February 15, 2023 <br /> Page 3 <br /> structures at the Thunderbird Mine are considered critical structures. The FOS are for both static and seismic(ground <br /> accelerations from an earthquake)stability analyses are listed in the DRMS policy. For generalized strength <br /> assumptions and critical structures, an FOS of 1.5 is considered sufficient for static conditions and an FOS of 1.3 is <br /> considered suitable for seismic conditions. <br /> The stability of structures within 200 feet of the proposed mining limits was evaluated at the three (3) most critical <br /> representative sections under anticipated loading conditions as discussed below. The GALENA computer program was <br /> used for the analysis. The method for selecting the critical failure surface for each analyzed loading condition was the <br /> following. The Simplified Bishop's Method of Analysis was used to find the critical failure surface by randomly searching <br /> 20,001 trial failure circles over a broad range of the slope surface and at the structure in question to evaluate the lowest <br /> FOS. Both static stability under anticipated mining conditions and seismic stability under peak ground acceleration loads <br /> were performed. Seismic loading was obtained from the U.S.G.S. Unified Hazard Tool attached to this report. Review of <br /> the Hazard Tool indicated a maximum horizontal acceleration of 0.0847g with a return period of 2,475 years for the site. <br /> The three (3) most critical cross section locations were selected and analyzed as described below. <br /> ► Excelsior Ditch Section: This section is in the northwest corner of the Phase 3 mine cell where the Excelsior <br /> Ditch is at its closest(-80 feet)to the mine highwall. An exploratory boring drilled in this area encountered <br /> approximately seven (7)feet of overburden overlying approximately twenty (20)feet of sand and gravel on top <br /> of claystone bedrock. This section considers a 27-foot tall highwall at a point where the mine limit is 80 feet <br /> from the Excelsior Ditch. A low permeability slurry wall is modelled 25 feet from the top of the highwall. The <br /> overburden is modelled at 7-feet thick overlying 20 feet of sand and gravel. The top foot of the claystone was <br /> modelled at residual strength reflecting the weathered nature at the top of the claystone. Unweathered <br /> claystone was modelled below the top foot. Mounded groundwater was modelled at a depth of 3 feet exterior to <br /> the slurry wall. This section was analyzed with both the slurry wall lining as well as the dewatered condition in <br /> the event that mining occurs prior to slurry wall installation. In the dewatered scenario the slurry wall is not <br /> modeled. <br /> ► Overhead Transmission Lines Section: This section is in the southwest corner of the Phase 2 mine cell where <br /> the overhead transmission line is at its closest(-150 feet), the mine highwall is at its tallest(-29 feet), and the <br /> weakest soil (overburden)forms a large part of the part(-12 feet)of the highwall. An exploratory boring drilled <br /> in this area encountered these conditions. A low permeability slurry wall is modelled 25 feet from the top of the <br /> highwall. The overburden is modelled at 12-feet thick overlying 17 feet of sand and gravel. The top foot of the <br /> claystone was modelled at residual strength reflecting the weathered nature at the top of the claystone. <br /> Unweathered claystone was modelled below the top foot. Mounded groundwater was modelled at a depth of 3 <br /> feet exterior to the slurry wall. This section was analyzed with both the slurry wall lining as well as the <br /> dewatered condition in the event that mining occurs prior to slurry wall installation. In the dewatered scenario <br /> the slurry wall was not modeled. <br /> ► Baxter Road Section: This section is on the west side of the site where wet mining of the fresh water and <br /> siltation ponds may approach within approximately 75 feet of Baxter Road. At this point the cell was modeled <br /> with a high wall of 0.5h:1v with a maximum depth of 20 feet. The overburden is modeled at 12-feet thick over 8 <br /> feet of sand and gravel. Bedrock was modeled at a depth of 29 feet with the top foot modeled as residual <br /> strength reflecting the weathered nature at the top of the claystone. Unweathered claystone was modeled <br /> below the weathered interval. Groundwater was modeled at a depth of 6-feet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.