Laserfiche WebLink
-4- <br /> 12. Primary future(Post-mining)land use check one): <br /> Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> F1 Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) ® Industrial/Commercial(IC) <br /> Developed Water Resources(WR) Solid Waste Disposal(WD) <br /> 13. Primary resent land use check One): <br /> C1 Cropland(CR) 1:1Pastureland(PL) ED General Agriculture(GA) <br /> Rangeland(RL) U Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) 1:1 Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.trucldshovel): <br /> Mine with conventional heavy duty equipment including but not limited to excavators,front end loaders,bulldozers,sreen and process on-site. <br /> 15. On Site Processing: Z Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): <br /> Crushing and screening <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> Petroleum products <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br />