My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-08-22_ENFORCEMENT - M1977170
DRMS
>
Day Forward
>
Enforcement
>
Minerals
>
M1977170
>
2023-08-22_ENFORCEMENT - M1977170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2023 9:01:56 AM
Creation date
8/22/2023 1:14:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977170
IBM Index Class Name
Enforcement
Doc Date
8/22/2023
Doc Name
Findings of Fact, Conclusions of Law and Order
From
DRMS
To
Charles Keller - Butala Construction Company
Email Name
CMM
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13.On May 25, 2021, the Division conducted an inspection of the Mine and <br /> specifically noted in the Inspection Report: <br /> The Phase 2 area is the creosote evaluation area. Activity in this <br /> area is limited to surface disturbance. No excavation is allowed <br /> here. Several materials stockpiles were stored in the area. <br /> 14.On March 15, 2011, the Division conducted an inspection of the Mine and <br /> specifically noted in the Inspection Report: <br /> Phase 2 is the creosote area. Butala is allowed to use the area for <br /> surface work but is not allowed to excavate. The plans call for its use <br /> as a stockpile and processing area only and is being used <br /> accordingly. <br /> 15.On September 28, 2004, the Division conducted an inspection of the Mine and <br /> specifically noted in the Inspection Report: <br /> The center of the mine contains creosol area. No mining is to take <br /> place in this area, only stockpiling of material. The area is 6.6 acres <br /> in size. The EPA removed the upper 3-4'of material from this area <br /> and stockpiled and capped the material on site. Markers delineate <br /> this area. <br /> 16. On July 13, 1998, the Division stated in a letter to Mr. Frank J Butala: <br /> You state that "No mining operations-excavations will occur within <br /> the "Creosote Evaluation Area"and that "surface operations relative <br /> to stockpiling will occur upon this area."... First, there will be no <br /> mining/excavation activities in the 6.2 acre creosote evaluation <br /> area. <br /> 17. On July 29, 1998, in response to the Division, Frank Butala of Butala <br /> Construction stated: <br /> "Creosote Evaluation Area"There will be no mining/excavating <br /> activities in the 6.2 acre creosote evaluation area. <br /> 18. The Division's September 14, 1998, Rationale for Recommendation for Approval <br /> Over Objections, stated: <br /> Will excavating activities on or near a creosote contaminated site <br /> adversely affect the health of the adjoining landowner? <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.