My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-08-15_REVISION - C1981008 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2023-08-15_REVISION - C1981008 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2023 3:51:05 PM
Creation date
8/17/2023 3:43:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
8/15/2023
Doc Name
Application
From
Elk Ridge Mining and Reclamation, LLC
To
DRMS
Type & Sequence
SL26
Email Name
CCW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
New Horizon Mine <br /> 8. Emergency Spillway (See Table 1, Spillway Sizing Guidelines) <br /> Bottom Width(ft) Side Slopes: Freeboard(ft)' Location relative to embankment(facing <br /> (Horizontal:1 Vertical) downstream) <br /> 24 3 3 (�)Left ()Right O No Spillway <br /> Freeboard means the vertical dimension between the crest(or invert)of the emergency spillway and the crest of the darn,the <br /> minimum is 3 feet. <br /> 9. Outlet Conduit <br /> Material Type Not Applicable <br /> Diameter(inches) <br /> Not Applicable <br /> For Livestock Water Tanks <br /> Can all water be drained through a gated or ungated outlet?O Yes(�)No <br /> For Erosion Control Dams <br /> Can water be drained through an ungated outlet leaving no more than 2 acre-feet in storage? O Yes O No <br /> 10. Dam Status <br /> 0 Proposed <br /> Existing' If existing,when was construction completed? March 2002 <br /> 'These dams may be subject to modification,alteration,repair,or breach consistent with the authority of the State <br /> Engineer. <br /> 11. Sign and Enter Name of Responsible Individual or Authorized Agent <br /> • Construction must reasonably comply with the attached standard plans and specifications and the claims made in this <br /> application.Dam designs completed by a Professional Engineer and submitted with the application may be accepted as <br /> an alternative to the standards.If the State Engineer finds that the construction fails to conform with the application <br /> and standards,it is the duty of the owner to make changes the State Engineer determines are necessary. <br /> • The making of false statements herein constitutes perjury in the second degree,which Is punishable as a class i <br /> misdemeanor pursuant to C.R.S.24-4.104(13)(a).I have read the statements herein,know the contents thereof and <br /> state that they are true to my knowledge. <br /> Sign or Enter Name(s)of Responsible Individual(s)or Authorized Agent Date <br /> Daniel J. Casiraro 11/4/2019 <br /> If Signing Enter Name and Title <br /> Daniel J. Casiraro, Senior Manager Environmental Services <br /> DRS-11:Application for Livestock Water Tank and Erosion Control Dam-Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.