My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-08-11_REVISION - M1982044 (22)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1982044
>
2023-08-11_REVISION - M1982044 (22)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2023 8:46:16 PM
Creation date
8/14/2023 1:58:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982044
IBM Index Class Name
Revision
Doc Date
8/11/2023
Doc Name Note
Exhibit D - Reclamation Plan
Doc Name
Request For Amendment To Permit
From
Craig Pester
To
DRMS
Type & Sequence
AM2
Email Name
ERR
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wildrye-2 pounds per acre <br /> Intermediate wheatgrass-2 pounds per acre <br /> Smooth brome -2 pounds per acre <br /> Slender wheat- 1 pound per acre <br /> Crested wheat- 1 pound per acre <br /> Perennial ryegrass- 1 pound per acre <br /> Orchardgrass- 1 pound per acre <br /> ( c)(v) Mulching is not recommended for this site and will not be used as part of <br /> reclamation. <br /> ( c)(vi) There will be no trees or shrubs beyond that contained in the standard seed mix, <br /> planted as part of the reclamation. <br /> (d) The site contains no ponds, streams, and no permanent buildings and none are <br /> anticipated through the life of the project. <br /> (e) There are no waste rock dumps, tailing impoundments, underground mine openings, <br /> ditches, sediment control facilities, buildings and other features on the site. <br /> (2) RECLAMATION COST ESTIMATE <br /> Reclamation costs are calculated using local contractors and prices. The bottom of the pit is to <br /> be graded approximately to the contours shown on Exhibit E-1, and the western and northwestern <br /> portion of the pit walls will be left approximately at as is as backdrop landscaping for the site. At <br /> the time of reclamation, the amount of topsoil on site will be evaluated and areas of the south and <br /> eastern edges of the pit will have soil installed, the total area being re-soiled being dependent on <br /> the amount of soil or growth media available. The assumptions for costing include that work <br /> will be performed using an excavator 312 Caterpillar or equivalent, a Caterpillar Model 212 <br /> grader, or equivalent, a wheel-loader sized at 2 cubic yards or greater, 12-yard dump truck, and a <br /> 4-Trax with harrow for covering seed. Other equivalent manufacturer's equipment can be <br /> substituted. Cost includes fuel, lubricants, operator wages and benefits, and equipment <br /> depreciation. It is assumed that the equipment and contractor are located within 20 miles of <br /> project area. <br /> Grade level area(4.5 acres) <br /> Produce finish grade on pit bottom (4.5 acres) - Dozer 4 hrs at $175/hr $ 700 <br /> Shape and finish west - north pit walls (3.3 acres)-Excavator 8 hrs at $175/hr $ 1,400 <br /> Dozer-4 hrs at $175/hr) $ 700 <br /> Shape and finish east - south pit walls (2.1 acres) - Dozer- 12 hrs at $175/hr) $ 2,100 <br /> Plant grass on east-south pit walls (2 acres) at$2,500/acre $ 2,500 <br />
The URL can be used to link to this page
Your browser does not support the video tag.