Laserfiche WebLink
Across Haul Road, the permittee shall submit a technical revision to the permit which <br /> provides a reclamation plan, sampling methodologies and reclamation success <br /> requirements for the cropland areas in accordance with Rule 2. 05. 4(2)(e), Rule <br /> 4.151(2)(c), Rule 4.15.9 and Rule 4.15.7(2). The technical revision needs to be approved <br /> prior to initiation of reclamation activities associated with the Tie Across Haul Road <br /> cropland areas. <br /> Revisions to the Permit <br /> Minor Revisions, Technical Revisions, Permit Revisions, and Bond Release approvals which <br /> have been made to the Hayden Gulch Loadout permit since the last renewal (RN-5) are listed <br /> below. <br /> Revision No. Description Issuance Liability <br /> Date Change <br /> TR12 Permanent Retention of Haul Road 2/24/2023 None <br /> MT6 Midterm Review Findings Dated November 20, 11/20/2020 None <br /> 2020 <br /> SL2 Phase I, II, &III Bond Release 2/18/2022 -$721,447.00 <br /> PR2 Use <br /> Revision for a Change in Postmining Land 1/4/2022 $336,029.09 <br /> Us <br /> MR27 Change Surface Ownership 5/8/2019 None <br /> Notice of Violations <br /> Notices of Violations which have been made to the Hayden Gulch Loadout permit since the last <br /> renewal (RN05) are listed below. <br /> No violations have been issued since the approval of RN-05. <br /> 11 <br />