My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-08-04_REVISION - M2010043
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2010043
>
2023-08-04_REVISION - M2010043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 9:54:47 AM
Creation date
8/8/2023 8:43:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010043
IBM Index Class Name
Revision
Doc Date
8/4/2023
Doc Name
Notice of Surety Increase
From
DRMS
To
Mason Chamberlain - Chamberlain Concrete
Type & Sequence
SI2
Email Name
ANM
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: Reclamation Cost Estimate Summary for the Falk Pit#1 <br /> Site: Falk Pit#1 Permit Action: 2023 Inspection ANM Permit/Job#: M2010043 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 6/30/2023 County: Phillips Filename: M043-000 <br /> User: ANM <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Backfill/Regrade Slopes to 3:1 DOZER 1 71.51 $19,931 <br /> 002 Replace Topsoil DOZER 1 8.32 $2,319 <br /> 003 Revegetate the Site REVEGE 1 7.00 $9,243 <br /> 004 Mob/Demob Reclamation Equipment MOBILIZE 1 3.93 $2,574 <br /> SUBTOTALS: 90.76 $34,067 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $688 <br /> Performance bond: 1.05 Total= $358 <br /> Job superintendent: 45.38 Total= $3,409 <br /> Profit: 10.00 Total= $3,407 <br /> TOTAL O&P= $7,862 <br /> CONTRACT AMOUNT(direct+O&P)= $41,929 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $0 Total= $0 <br /> Engineering work and/or contract/bid preparation: 4.25 Total= $1,782 <br /> Reclamation management and/or administration: 5.00 $2,096 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $11,740 <br /> TOTAL BOND AMOUNT(direct+indirect)= $45,807 <br /> Page 1 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.