Laserfiche WebLink
E. Other Disturbances (please describe) <br /> Disturbances beyond the drill access trails, pads and sumps are not expected. Access <br /> via a trail vs. a road is differentiated by the use of a bulldozer or grader that would e <br /> needed to cut a road into the around surface Access to collar locations will rely on drill <br /> trails that traverse the native terrain minimizing impact. <br /> F. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to <br /> store. <br /> Bentonite and cement, used to abandon holes, will be stored on site. Diesel fuel will be <br /> transported in the tanks on the pickups used by the drill crews and will be transferred to <br /> the rig each day. Drill fluids and lubricants will be stored on site while petroleum products <br /> (gasoline, lubricants, etc.)will be stored on site in leak-proof, fuel containment tubs. <br /> G. New 11tMTrails <br /> Length (ft): 2898 Width (ft): 10 <br /> Significantly <br /> Upgraded RMXX Trails Length (ft): 3868 Width (ft): 10 <br /> Are culverts or other crossings proposed? If so,please describe: <br /> Culvert installation is not anticipated. <br /> H. Total project area to be disturbed (acres) Up to 4.5 acres if all 20 holes are drilled and require a full size drill pad. <br /> 1. Describe the equipment to be used for the prospecting operations: <br /> Surface air/mud rotary drill rig, diamond core drill rig, air compressor, water truck, pipe <br /> ruc , backhoe, grader, 15011 dozer, seed drill, pic -up trucks, light pans as needed, small <br /> gene mobe truck. <br /> Form 2-Public File Page 7 of 14 <br />