My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-08-04_REPORT - M1988112
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1988112
>
2023-08-04_REPORT - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2023 8:43:18 PM
Creation date
8/7/2023 8:46:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
8/4/2023
Doc Name
Monthly Report
From
Battle Mountain Resources, Inc
To
DRMS
Annual Report Year
2023
Report Quarter_Month
Jul
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2-Monthly Piezometer Elevations <br /> Monitoring Well Piezometer Depth Depth to Water Depth of Water <br /> Identification Observation Date ft ft ft <br /> P6 07/31/2023 72.46 DRY N/A <br /> P7 07/31/2023 92.50 DRY N/A <br /> P8 07/31/2023 97.51 96.65 0.86 <br /> P9 07/31/2023 72.30 71.95 0.35 <br /> P10 07/31/2023 58.30 57.47 0.83 <br /> I'll 07/31/2023 41.80 41.39 0.41 <br /> P12 07/31/2023 41.71 41.63 0.08 <br /> P13 07/31/2023 41.34 41.02 0.32 <br /> P14 07/31/2023 41.24 DRY N/A <br /> P15 07/31/2023 1 41.10 1 40.85 1 0.25 <br /> The leak detection system at the LTF Collection Pond was inspected July 31, 2023 and 890 gallons were <br /> evacuated from the leak detection system and pumped to the LTF. The LTF underdrain system was visually <br /> inspected July 31,2023 and the flow rate was measured to be approximately 27.8 gallons per minute(gpm). <br /> West Pit Waste Water Treatment Plant <br /> During the month of July 2023, the West Pit Waste Water Treatment Plant (WWTP) was operated <br /> intermittently (3 to 4 days per week) under Colorado Department of Public Health and Environment <br /> (CDPHE) CDPS Permit No. C00045675 for discharge into the Rito Seco alluvial aquifer. During the <br /> month, 7,885,800 gallons (24.20 acre-feet) of treated water was discharged to the Rito Seco and 421,700 <br /> gallons (1.29 acre-feet) of water was transferred from the West Pit to the Lined Tailing Facility (LTF). <br /> Additionally,no water was reinfiltrated into the West Pit in May. <br /> BMRI performed the monthly visual seepage expression inspections on July 31, 2023, in the historic <br /> seepage area identified in Figure 2 of the permit. No seepage expressions were observed in the historic <br /> seepage area. <br /> BMRl measured the monthly West Pit backfill, alluvial and monitoring wells as required under in the <br /> QA/QC Plan. Measurements obtained for the monthly wells are shown in Table 3. <br /> Table 3-Monthly and Quarterly Groundwater Depth to Water <br /> Monitoring Well Identification Observation Date Depth to Water <br /> ft <br /> BF4 7/31/2023 24.89 <br /> BF-5R 7/31/2023 30.83 <br /> BF-6 7/31/2023 30.92 <br /> M-6 7/31/2023 DRY <br /> M-7 7/31/2023 DRY <br /> M-8 7/31/2023 DRY <br /> M-9 7/31/2023 141.28 <br /> M-10 7/31/2023 24.23 <br /> M-11 R 7/31/2023 39.56 <br /> M-12 7/31/2023 174.33 <br /> M-13R 7/31/2023 125.67 <br /> M-14 7/31/2023 130.5 <br /> M-16 7/31/2023 22.04 <br /> M-17 7/31/2023 29.92 <br />
The URL can be used to link to this page
Your browser does not support the video tag.